Summary
The Commonwealth of Kentucky, Energy and Environment Cabinet (Division of Water) is soliciting bids for the rehabilitation of Willisburg Lake Dam, including construction of a reinforced concrete auxiliary spillway, a rockfill stability berm, a new low-level drawdown valve, site preparation, erosion and sediment control, and demolition of existing infrastructure. A pre-bid meeting and site visit are scheduled for 2026-06-18; bidders must submit through the Commonwealth's eProcurement system and comply with required health and safety and water diversion planning. The solicitation opened on 2026-06-11 and closes on 2026-08-31, and is an Invitation for Bid (construction procurement), not a grant.