Summary
The Commonwealth of Kentucky, Division of Water (Energy and Environmental Cabinet) is soliciting bids for the Willisburg Lake Dam Rehabilitation Project, which includes construction of a reinforced concrete auxiliary spillway, a reinforced concrete floodwall, and a rockfill stability berm. The scope includes site preparation, erosion and sediment control, demolition of existing storm sewer and raw water lines, installation of new raw water intake lines, a new low-level drawdown valve, and remediation of concrete cracking and seepage in the principal spillway culvert. This Invitation for Bid is posted to the Kentucky Vendor Self Service portal and lists Susan Ward (Purchasing Agent) as the contact; the aggregator lists a close date of 2026-08-31 for proposals.