Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes provide improved fish passage; enhance fish habitat; stabilize the stream channel; reduce flood risks; repair or replace damaged culverts; and reduce city maintenance requirements (such as sediment removal).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of water distribution system pipelines & components replacing existing water infrastructure consisting of approx 50,667 LF of 8" dia pipelines and 7,581 LF of 12" diameter pipelines. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, swppp measures, traffic control.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Construction of water distribution system pipelines & components replacing existing water infrastructure consisting of approx 50,667 LF of 8" dia pipelines and 7,581 LF of 12" diameter pipelines. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, swppp measures, traffic control.
AvailableFlume creek culvert replacement and channel restoration.
Posted Date
Jan 2, 2026
Due Date
Jan 30, 2026
Release: Jan 2, 2026
Close: Jan 30, 2026
Flume creek culvert replacement and channel restoration.
AvailableProject consists of culvert replacement.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Project consists of culvert replacement.
AvailableThe City of Avalon seeks statements of qualifications from design-builders to provide progressive design-build services for the Cabrillo Mole Revitalization Phase II project, including replacement and expansion of the ferry intermodal terminal. The successful proposer will execute the progressive design-build contract and deliver a modernized terminal meeting the City’s requirements.
Posted Date
Nov 17, 2025
Due Date
Jan 22, 2026
Release: Nov 17, 2025
Close: Jan 22, 2026
The City of Avalon seeks statements of qualifications from design-builders to provide progressive design-build services for the Cabrillo Mole Revitalization Phase II project, including replacement and expansion of the ferry intermodal terminal. The successful proposer will execute the progressive design-build contract and deliver a modernized terminal meeting the City’s requirements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →