Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Flume creek culvert replacement and channel restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of culvert replacement.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Project consists of culvert replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The contract provides for the replacement of (1) fish barrier culvert with a fish passable concrete slab bridge placed on a pile foundation including concrete wingwalls, and associated roadwork. Work also includes to (1) drainage ditch culvert with an HDPE pipe, temporary traffic control, guardrail installation, temporary stream diversion, construction dewatering, clearing & grubbing, excavation, streambed construction, large woody material placement, site restoration, paving, and other work.
Posted Date
Dec 18, 2025
Due Date
Jan 14, 2026
Release: Dec 18, 2025
Close: Jan 14, 2026
The contract provides for the replacement of (1) fish barrier culvert with a fish passable concrete slab bridge placed on a pile foundation including concrete wingwalls, and associated roadwork. Work also includes to (1) drainage ditch culvert with an HDPE pipe, temporary traffic control, guardrail installation, temporary stream diversion, construction dewatering, clearing & grubbing, excavation, streambed construction, large woody material placement, site restoration, paving, and other work.
AvailableRemoval of an existing culvert and replacement.
Posted Date
Dec 29, 2025
Due Date
Feb 5, 2026
Release: Dec 29, 2025
Close: Feb 5, 2026
Removal of an existing culvert and replacement.
AvailableThe City of Northampton seeks sealed bids to remove the failed culvert on Old Wilson Road and restore the existing stream channel as part of a broader Nashawannuck Brook ecological restoration and access improvements project. The work includes culvert removal, opening the stream, associated restoration, and related access features; the effort has been advanced alongside the Massachusetts Department of Ecological Restoration. Bids are due January 23, 2026 at 2:00 PM Eastern via COMMBUYS.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
The City of Northampton seeks sealed bids to remove the failed culvert on Old Wilson Road and restore the existing stream channel as part of a broader Nashawannuck Brook ecological restoration and access improvements project. The work includes culvert removal, opening the stream, associated restoration, and related access features; the effort has been advanced alongside the Massachusetts Department of Ecological Restoration. Bids are due January 23, 2026 at 2:00 PM Eastern via COMMBUYS.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →