Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; only pursue if there’s a true uniqueness case and Procurement directs you. Otherwise, pivot back to coops.
Coops: If your offering is available via Sourcewell or Texas DIR, lead with that and confirm with Procurement that the city can buy through your contract.
City of Federal Way (WA). Sole source is infrequently used and opaque.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Federal Way's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Community Engagement Coordinator
City Administrator
City Clerk
Mayor
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Federal Way
Construction, sequencing, and traffic control plan for overlaying existing asphalt concrete pavement in seven (7) different locations within the City of Federal Way. The work shall include to Hot Mix Asphalt (HMA Cl. 1/2" PG 58H-22) pavement overlay, roadway excavation, planing bituminous pavement, pavement repair, removal and replacement of curb and gutter, sidewalk, curb ramps, traffic curb, repairing or re-aligning manholes and catch basins, channelization, restoration, utility adjustments, and all items necessary to complete the work.
Posted Date
Jan 5, 2026
Due Date
Jan 26, 2026
Release: Jan 5, 2026
City of Federal Way
Close: Jan 26, 2026
Construction, sequencing, and traffic control plan for overlaying existing asphalt concrete pavement in seven (7) different locations within the City of Federal Way. The work shall include to Hot Mix Asphalt (HMA Cl. 1/2" PG 58H-22) pavement overlay, roadway excavation, planing bituminous pavement, pavement repair, removal and replacement of curb and gutter, sidewalk, curb ramps, traffic curb, repairing or re-aligning manholes and catch basins, channelization, restoration, utility adjustments, and all items necessary to complete the work.
AvailableCity of Federal Way
The City of Federal Way seeks civil/environmental engineering services for Kim's Pond restoration, including survey, wetland design, environmental documentation, and construction management. The project involves restoring the pond to natural conditions, removing the existing outfall, reestablishing the stream channel, eliminating invasive species, and replanting with native species. Coordination with the Army Corps of Engineers and obtaining necessary permits are required.
Posted Date
Nov 1, 2025
Due Date
Nov 21, 2025
Release: Nov 1, 2025
City of Federal Way
Close: Nov 21, 2025
The City of Federal Way seeks civil/environmental engineering services for Kim's Pond restoration, including survey, wetland design, environmental documentation, and construction management. The project involves restoring the pond to natural conditions, removing the existing outfall, reestablishing the stream channel, eliminating invasive species, and replanting with native species. Coordination with the Army Corps of Engineers and obtaining necessary permits are required.
City of Federal Way
Work includes provide improved fish passage; enhance fish habitat; stabilize the stream channel; reduce flood risks; repair or replace damaged culverts; and reduce city maintenance requirements (such as sediment removal).
Posted Date
Aug 15, 2025
Due Date
Sep 5, 2025
Release: Aug 15, 2025
City of Federal Way
Close: Sep 5, 2025
Work includes provide improved fish passage; enhance fish habitat; stabilize the stream channel; reduce flood risks; repair or replace damaged culverts; and reduce city maintenance requirements (such as sediment removal).
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.