Various Draper Water Treatment Plant Improvements RFP
Scope consists of 1 LS chemical system improvements; 9 EA 36" motorized actuator; 3 EA 60" motorized actuator; 4 EA 36" butterfly valve, mj.
Description: PUBLIC ANNOUNCEMENT REQUEST FOR STATEMENT OF QUALIFICATIONS FOR VARIOUS PROJECTS AND STUDIES FOR WATER MAINS, DISTRIBUTION SYSTEM, AND WATER TREATMENT PLANT IN THE CITY OF ELYRIA FOR THE CALENDAR YEARS 2025, 2026, AND 2027 The City of Elyria invites Statement of Qualifications (SOQs) from the qualified Firms, Companies, and/or Consultants for Engineering, Consulting and Professional Services for the Preliminary Study and/or Final Design for various Municipal Improvement Projects including: Water Distribution System and Water Treatment Plant for the three-year period in the calendar years 2025, 2026, and 2027. Requirements for Statements of Qualifications, Programmatic Selection Process: A. SOQs will be submitted with the following information: 1. History and its experience and technical knowledge in the field(s) of the firm’s interest. 2. List of owners, key technical personnel and their experience. 3. Firm’s location, equipments, facilities and references. 4. List of projects in similar nature in alphabetical/numeric order. For each project furnish the detailed information and contact persons with their phone number(s). The information about these projects should include, but not limited in nature, of each project, estimated cost, actual services provided, time of completion and number of change orders. 5. List the Project Manager and other key staff members, key sub-consultants, if any, availability of staff and brief resumes for the key personnel. Selection Procedures The City of Elyria will maintain a list of qualified professional firms for selection of Firm/Consultant for each field. Each Professional Firm/Consultant shall be responsible to update its SOQ on file in accordance with ORC 153.65-71 as and when necessary. The City of Elyria will evaluate and select qualified Firms/Consultants from the list on file at the time for a specific project and/or study per ORC 153.65-71. Competitive price selection will not be utilized under the selection process. Firms/Consultants must submit a SOQ for its Firm to the Water Plant Operations Superintendent at the address mentioned below. The Firm/Consultant shall mention which type of work it is interested in. Interested Firms/Consultants are encouraged to submit their SOQ by January 1, 2025. SOQs will, however, be accepted any time during the calendar years 2025, 2026, and 2027. One original Statement of Qualifications and one electronic copy in PDF or MS-Word format on USB shall be submitted to: Samuel W. Jacob, P.E., Operations Superintendent, 131 Court St., Elyria, OH 44035 The electronic copy can be emailed to Samuel W. Jacob at swjacob@cityofelyria.org. Questions about the anticipated projects, work and/or SOQs may be directed to Samuel W. Jacob, P.E., Operations Superintendent at (440) 326-1416.
City · OH, US
Adjacent opportunities open for bidding right now.
CityOK
Posted
Oct 14, 2026
Nov 18, 2026
Scope consists of 1 LS chemical system improvements; 9 EA 36" motorized actuator; 3 EA 60" motorized actuator; 4 EA 36" butterfly valve, mj.
Special DistrictTN
Posted
Oct 21, 2026
Nov 25, 2026
Seeking qualified suppliers for a complete, 7-mgd, ceramic membrane filtration system for the expansion of the Water Treatment Plant.
CityFL
Posted
Sep 29, 2026
Nov 9, 2026
Work includes providing interior upgrades, repairs and new corrosion protection lining system to both reservoirs.
CityCO
Posted
Oct 9, 2026
Nov 10, 2026
This RFP is for the purchase of a Top Entry Mixer required to mix Powdered Activated Carbon (PAC) slurry. The existing Philadelphia Mixers Corporation mixer was installed circa 1988 and requires replacement based on age. The PAC mixer is operated 24 hours per day, 7-days per week, during the Site’s operational season.
Decision makers connected to this RFP from City of Elyria.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
Engineer Schneider's proposed additional design and bidding-document work for water-treatment-plant high-service pumps, VFDs and valves was approved by the Utilities, Safety, & Environment Committee, with early procurement needed for 30–40-week equipment lead times.
Um the next item on the agenda is the matter of amendment number two, professional service agreement with Black and Beach. >> Mr. Engineer Schneider. >> Thank you, Madam Chairman. So, uh Black & Beach is uh performing a number of uh studies as well as uh improvements we're looking to do out at the water plant out in Lraine. Uh, one of the items that is part…
Utilities, Safety, and Environment Committee Meeting
Board meeting · Oct 8, 2025
Board meeting
The Joint Community Development & Finance Committee approved amendment number three for Black & Beach's final design of water-treatment-plant chlorine-building deficiencies before a later construction bid.
Excuse me. Next item on the agenda is number five. the matter of amendment number three for a professional service agreement with Black and Black and Beach for improvements and upgrades at the water treatment plant. Engineer Schneider. >> Thank you, Mr. Chairman. Um, so about a year ago, we entered in a contract with Black & Beach for uh some assessments as…
Board meeting
Director Pyanowski reported planned distribution-system installation for Sheffield service and further investigation of a compromised Black River line and related easements.
The next item on the agenda is the matter of entering into a contract for the sale of water to Sheffield Village. Safety Service Director Director Pienowski, please. >> Thank you. Through you, uh we've been in conversations with Sheffield Village for um in excess of 6 months um to talk through this. We've not previously sold them water, but they have a need…
Board meeting
The Gulf Road Water Main Improvement Project was in design, with EPA permitting and bidding planned before later-year construction to support water service to Sheffield Village.
2. The matter of a Water Supply Revolving Loan Account Fund Application and Agreement for the Gulf Road Water Main Improvement Project. Referred By: Engineer Schneider Engineer Schneider said as part of the City's selling water to Sheffield Village and as part of that the City has to make some improvements. This is to apply for a Division of Environmental…
RFP published
Proposals due (421 days left)
Joint Community Development & Finance Committee Meeting
Board meeting · Jan 12, 2026
Utilities, Safety & Environment Committee Meeting Minutes
Board meeting · Mar 18, 2026
Joint Utilities and Finance Committees Meeting Minutes
Board meeting · Jun 8, 2026
The second one is in the water fund, water misc. capital outlay, adding 1 million to that line item due to the discussion with engineering regarding the Gulf Road water line project, to supply water to Sheffield. There were no further questions and Chair Tollett read the committee report and asked for a motion. Motion made by Mr. Van Wormer seconded by Mr.…
Finance Committee Meeting Minutes
Board meeting · Jun 8, 2026