Procurement and installation of six (6) Wall Spring membrane filtration system units, backboard support, booster pump, variable frequency drive (VFD), water quality analyzers, air compressors, control panels, conduit & wiring, instrumentation, tubing, piping, appurtenances and supports. Demolition of existing booster pump and additional piping as noted on plans and as required to configure to existing system. Trenching and plumbing of piping to discharge potable water into existing clearwell reservoir. Integration and reconfiguration of the existing system to incorporate the new filtration units and controls. Programming for programmable logic control (PLC) and operator interface terminal (OIT) equipment.