Open RFP

Hearst San Simeon Shm - Reservoir #3 Water Treatment Plant Upgrade

Description: Procurement and installation of six (6) Wall Spring membrane filtration system units, backboard support, booster pump, variable frequency drive (VFD), water quality analyzers, air compressors, control panels, conduit & wiring, instrumentation, tubing, piping, appurtenances and supports. Demolition of existing booster pump and additional piping as noted on plans and as required to configure to existing system. Trenching and plumbing of piping to discharge potable water into existing clearwell reservoir. Integration and reconfiguration of the existing system to incorporate the new filtration units and controls. Programming for programmable logic control (PLC) and operator interface terminal (OIT) equipment.

Released
Sep 23, 2026
Closes
Oct 23, 2026(20 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts