Closing soon

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

Description: Project Name: Jennings Hall - Classroom Pool Rms 001 and 155 Response Deadline: 11/16/2026 2:00 PM local time Project Location: Jennings Hall (0014) Project Number: OSU-270078 City / County: Columbus/ Franklin Project Manager: David Warye Owner: The Ohio State University Contracting Authority: Local Higher Education Delivery Method: Design-Build Prevailing Wages: State No. of paper copies requested (stapled, not bound): 0 No. of electronic copies requested (PDF): 1 Submit the Statements of Qualifications (Form F110-330) via email to 330Submittals@osu.edu. In the subject line, include the project number and name for the RFQ you are responding to. See Section G of this RFQ for additional submittal instructions. Submit all questions regarding this RFQ in writing to David Warye at warye.6@osu.edu with the project number and name included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC website on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document. Project Overview: A. Project Description For this project, the Owner will be requesting a Competitive GMP at the time of Request for Proposal as part of the Best Value selection process. Jennings Hall is an academic building used by the Department of Arts and Sciences Advancement, original construction in 1914, spans 112,502 square feet and is located on 1735 Neil Avenue, Columbus, OH. The HVAC system features air handling units with heating and cooling loops, supported by pumps and auxiliary cooling systems. All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owner's policies and procedures. This project is to renovate Lecture Hall 155 located on the first floor and Lecture Hall 001 located on the ground floor. The renovations are to start the last week of April 2027 and all construction activities are to be completed prior to Fall Semester 2027. Criteria documents prepared by the OSU-OTDI Lead Interior Designer, as well as the Hazardous Materials (HazMat) survey, will be made available to short-listed firms for use in the development of their technical and cost proposals. OTDI-LCE requires three weeks prior to Fall Semester to install technology systems in both Lecture Halls. OTDI-LCE will provide and install AV technology which includes projectors, displays, projection screens, mounting accessories and ceiling mounted microphones. Design Builder (DB) to provide mounting structure for ceiling mounted projectors and video displays. Provide duplex receptacles in ceiling for each projector as well as wall boxes and wire path for low voltage. The DB is responsible for all wall patching, repair, and surface preparation required prior to the installation of new finishes. The DB shall propose finish materials and color selections for both Lecture Halls that are consistent with the University's branding palette. Final finishes selections shall be reviewed and approved by the OSU-OTDI Lead Interior Designer prior to procurement or installation. DB shall perform all necessary modifications to existing HVAC and electrical systems to support the new ceiling layout. DB to provide any necessary modifications in the Lecture Halls to support OSU's deferred maintenance program as needed in the spaces. Lecture Hall 001 (3,233 S.F.) Scope includes removal of partition walls around the ADA ramp and all fixed seating. Existing ceiling grid and lighting fixtures are to be demolished. Provide new grid, ceiling tile and lighting. Lighting layout and technology systems are to be designed in full compliance with University's Building Design Standards (BDS), with particular attention to classroom specific requirements. OTDI will demolish all existing technology between 5/5/27 and 5/7/27. Existing chalkboards are to be removed and replaced with new whiteboards. Contractor to field-verify all existing wall dimensions. Final whiteboard quantities and locations shall be coordinated during design with the OTDI Lead Interior Designer. All existing acoustical panel tackboards shall be removed and replaced. Contractor to install owner-provided projection screen and coordinate required electrical modifications to support the installation. Provide new fixed seating (Classroom Pool standard: KI Concerto), new carpet and paint. Provide new signage outside of Lecture Hall as well as new ST-25 flag signs above doors. Provide new door Classroom Pool hardware and stickers indicating emergency lock use. DB to provide geo-technical support to investigate water penetration reported in the lower portion of Lecture Hall. Lecture Hall 155 (1,921 S.F.) Scope includes removal of all fixed seating. Existing ceiling grid and lighting fixtures to be demolished. Provide new grid, ceiling tile and lighting. Lighting layout and technology systems to be designed in full compliance with University's Building Design Standards (BDS). OTDI will demolish all existing technology between 5/5/27 and 5/7/27. Existing chalkboards are to be removed and replaced with new whiteboards; contractor to field-verify dimensions. The design shall include a minimum of four (4) new whiteboards. All existing acoustical panel tackboards shall be removed and replaced. Contractor to install owner-provided projection screen and coordinate required electrical modifications. Provide new fixed seating (KI Concerto), new carpet and paint, new signage, ST-25 flag signs above doors, new door Classroom Pool hardware and emergency lock stickers. DB to address tier/slope of seating area to reduce trip hazard. DB shall plan for and implement all necessary asbestos abatement measures to address asbestos-containing debris identified by EHS on the surface of existing ceiling tiles. B. Scope of Services Owner will request a GMP as part of Best Value selection; self-performed work will be approved subject to subcontractor plan. Short-listed firms are treated as approved subcontractors for this purpose. Selected DB will discuss and clarify Agreement cost components, refine schedule, and participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required. Provide and maintain estimates of probable construction cost, Target Value Budget/Target Value Design, project schedules, and lead Schematic Design through Closeout stages. Follow applicable University Sustainability Standards. Selected DB required to sign standard agreement provided at time of RFP; no modifications accepted. Professional Liability Insurance per General Conditions. Preconstruction and construction services described; subcontracts (except self-performed work) to be awarded by DB to prequalified vendors using a competitive process. Open book pricing; Contracting Authority/Owner access to DB books and records related to bidding, pricing, performance. Preconstruction services include schedule and estimate development, program verification, schematic design, design development, subcontractor prequalification and bidding, construction documents, constructability review, permits, budgeting, and preconstruction planning. Construction services include constructing per documents and schedule, holding subcontracts, responsibility for means and methods, weekly progress meetings, testing and inspections, project safety, compliance with EDGE, equal employment, prevailing wage requirements, and submitting monthly reports. Closeout required in electronic cloud-based format using e-Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. Relevant Project Experience requirements and list of scope components for completing Section F of Form F110-330 are provided. For selection of 10 Relevant Projects, projects must have been completed by the Design Build Firm. C. Funding / Estimated Budget Total Project Cost: $1,460,000 State Funding: $0 Construction Cost: $1,165,000 Other Funding: $1,460,000 D. Anticipated Schedule DB Preconstruction Services Start: 01/2027 Construction Stage Notice to Proceed: 04/2027 Substantial Completion of all Work: 08/2027 DB Services Completed: 10/2027 E. EDGE Participation Goal Percent of the DB's total compensation excluding DB's Contingency: 5% (Preconstruction Stage Compensation plus Contract Sum minus DB's Contingency) F. Evaluation Criteria for Selection Qualifications-based process for RFQ to develop short list, then best value process for RFP. Short list of no fewer than three candidates unless fewer qualified. RFP to short-listed firms will request pricing proposals including preconstruction stage compensation, construction stage personnel costs, itemized general conditions, contingency percentage, design fee percentage, and design-build fee percentage; short-listed candidates will receive form of Agreement, criteria documents and proposed schedule. Pre-proposal meetings and interviews will be scheduled individually for short-listed firms. Selection schedule (tentative): Qualifications Due 11/16/2026; RFP issued to Short-Listed Firms 11/17/2026; Proposals Due 11/30/2026; Interviews 12/02/2026; Selection of DB 12/04/2026. G. Submittal Instructions Firms required to submit current version of Statement of Qualifications (Form F110-330). Electronic submittals should be combined into one PDF file saved with the form name, project number and firm's name (example naming provided). Use print-to-PDF rather than a scanner; reduce file size if possible. Statements of Qualifications must be submitted electronically by email. Submittals are limited to one email with maximum file size of 25 MB. Certain information submitted will remain confidential (Proposal Form(s) except cost category subtotals, Financial Capacity, Bonding/Insurance). Requested submission contents and attachment requirements listed in Section G, including summary, bonding/insurance evidence, management systems description, self-performed work disclosure, estimating and scheduling experience, professional registrations/credentials, and EDGE participation documentation. Firms must indicate locations where services will be performed per Executive Orders 2019-12D and 2022-02D; failure may cause rejection. Additional documents: Design-Build Selection Rating Form and detailed evaluation/scoring criteria included.

Buyer
The Ohio State University

HigherEducation · OH, US

Released
Oct 30, 2026
Closes
Nov 16, 2026(1 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts