Closing soon

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Description: Administration of Project: Local Higher Education Project Name Hughes Hall Renovation Response Deadline 11/18/2026 2:00 PM local time Project Location 1899 College Road Project Number OSU-270007 City / County Columbus / Franklin Project Manager Karin Murillo-Kirlangitis Owner The Ohio State University Contracting Authority The Ohio State University Delivery Method CM at Risk Prevailing Wages State No. of paper copies requested (stapled, not bound) 0 No. of electronic copies requested (PDF) 1 Submit the Statements of Qualifications (Form F110-330) via email to: Hughes_Hall_Renovation.01_Selection1@docs.e-builder.net In the subject line, include the project number and name for the RFQ you are responding to. See Section G of this RFQ for additional submittal instructions. Submit all questions regarding this RFQ in writing to Karin Murillo-Kirlangitis, murillo-kirlangitis.1@osu.edu, with the project number and name included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC website on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document. Project Overview A. Project Description The Ohio State University is soliciting qualifications from Construction Management (CM) firms to provide preconstruction services and, if selected, construction management services for the upcoming renovation of Hughes Hall. The Hughes Hall Renovation project will modernize and revitalize Hughes Hall, a 60,613 GSF academic building located at 1899 College Road on The Ohio State University's Columbus campus, prominently situated immediately north of the Oval. The primary purpose of the renovation is to provide a transformative and modernized home to support the College of Arts and Sciences' current and future academic, administrative, and collaborative needs. The project will address significant deferred maintenance needs throughout the building, including comprehensive upgrades to the building envelope, such as the roof, windows, and masonry systems, to improve long-term durability, performance, and sustainability. In addition, the existing mechanical, electrical, and plumbing (MEP) systems are to be upgraded or replaced to enhance reliability, occupant comfort, and operational efficiency. Hazardous materials abatement throughout the facility is also anticipated as part of the renovation scope, enabling the transformation of Hughes Hall into a modern, accessible, and high-performing academic building that supports the evolving needs of students, faculty, and staff. Professional design services are being acquired by the Contracting Authority under a separate contract. The Program of Requirements ("POR") will be validated as a part of this project by the Architect/Engineer ("A/E") based on data provided by FDC. All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority/Owner's policies and procedures. B. Scope of Services The project and construction budget as listed in this RFQ is estimated. The project has been approved for design and preconstruction services only. This request is for Construction Manager at Risk ("CM") to assist with preconstruction to establish the schematic design concept and begin design development. The university may amend the CM contract upon approval for construction documents, bidding, construction contract administration and post-construction services. The selected Construction Manager at Risk, as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority/Owner, the breakdown of the Agreement detailed cost components, to address the Owner's project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, Target Value Budget/Target Value Design, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website. The selected CM will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. Required Professional Liability Insurance will be per General Conditions Articles 10.3.7 and 10.3.8. This project is required to be designed and delivered within a collaborative BIM-enabled environment following The Ohio State University BIM Project Delivery Standards. The Primary firm submitting for the project will be required to have the BIM expertise capable of meeting the aforementioned standards. The Ohio State University BIM Project Delivery Standards can be accessed via the OSU FOD website. The minimum required BIM Use Cases for this project are noted in the RFQ. The minimum required deliverables for this project are noted in the RFQ. This project includes asset tagging; the Primary firm is required to have the expertise to meet this prerequisite and support subcontractors. Asset tagging materials and templates are available via the OSU FOD resources. The project shall follow the applicable University Sustainability Standards. The project team (Owner / A/E / CM) will be required to utilize e-Builder, the University's Project Management System, for all compatible services required by the University. The preconstruction and construction services are generally described in the RFQ. Subcontracts including but not limited to Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method. The Contracting Authority/Owner shall have access to all books, records, documents and other data in the CM's possession related to bidding, pricing or performance of the Agreement. Preconstruction Services: The CM will work cooperatively with the Contracting Authority/Owner, A/E, and Project Team, and will provide schedule development, estimate development, Guaranteed Maximum Price (GMP) proposal, subcontractor prequalification and bidding, constructability review, permits, budgeting, Target Value Budget/Target Value Design, and preconstruction planning throughout the preconstruction stages. Basis Documents and Design Intent Statement procedures are described. Contingent upon the Contracting Authority's approval of the GMP, parties will enter into a GMP Amendment. If the proposed Contract Sum exceeds the Project Budget, the Contracting Authority may terminate the agreement with the CM and seek proposals from other firms. Construction Services: The CM shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The CM shall hold all subcontracts and shall be fully responsible for the means and methods of construction, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-03-02. The Contracting Authority reserves the right to approve the CM's selection of subcontractors and any supplemental terms to the form subcontract. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors and contractors. Guidelines governing safety expectations for construction/renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized in OSU FOD resources. Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using e-Builder Project Management System and adhere to The Ohio State University Project Closeout Standards, available via OSU FOD vendor resources. Relevant Project Experience Matrix requirements and examples are outlined in the RFQ, including required experience areas and that the listed Relevant Projects must have been completed by the Construction Management Firm. C. Funding / Estimated Budget Total Project Cost $57M State Funding $30M Construction Cost $39M Other Funding $27M D. Anticipated Schedule CM Preconstruction Services Start 2 / 2027 Construction Stage Notice to Proceed 9 / 2027 Substantial Completion of all Work 4 / 2029 CM Services Completed 10 / 2029 E. EDGE Participation Goal Percent of the CM's total compensation excluding CM's Contingency* 5.0% F. Evaluation Criteria for Selection Selection uses a qualifications-based RFQ to short-list and a best value RFP for selection. Short list no fewer than three candidates unless fewer are qualified. Short-listed firms will be issued an RFP (tentatively 12/4/2026) and proposals due 1/4/2027; interviews 1/12/2027; selection of CM 1/14/2027. The RFQ and subsequent processes describe pre-proposal meetings, interviews, submission of Contractor Pre-Work Evaluation form at pre-proposal meeting, and other requirements. Firms must address BIM experience, EDGE participation commitments and intent to contract with EDGE-certified Business Enterprises, and compliance with Executive Orders regarding service locations and restrictions. G. Submittal Instructions Firms are required to submit the current version of Statement of Qualifications (Form F110-330). Electronic submittals should be combined into one PDF file saved with the form name, project number listed on the RFQ and your firm's name (example shown in RFQ). Use the "print" feature of Adobe Acrobat or similar software for creating a PDF rather than using a scanner. Reduce file size if possible. Insert the project number and name in the email subject line. Statements of Qualifications must be submitted electronically by email. Submittals are limited to one email with a maximum file size of 25 MB. Unless otherwise noted or exempt, all documents submitted in response to this RFQ and subsequent RFP are public and will be available for inspection at the conclusion of the selection process. The following information shall remain confidential and will not be released: (1) Proposal Form(s), except for cost category subtotals which will be transferred to the Best Value Rating Form; (2) Financial Capacity; and (3) Bonding/Insurance. Required submittal content and additional instructions are described in Section G and Section H of Form F110-330, including summary, bonding/insurance evidence, management systems, self-performed work disclosure, estimating, scheduling, and professional registrations/credentials. Selection Rating Form and evaluation criteria details are included in the RFQ.

Buyer
The Ohio State University

HigherEducation · OH, US

Released
Nov 2, 2026
Closes
Nov 18, 2026(3 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts