Summary
Jefferson County, Washington is soliciting proposals from a multi-disciplined engineering firm to provide civil and structural engineering, surveying, geotechnical engineering, geology, hydrology and hydraulic analysis, and environmental assessments and permitting services for the Powerlines Reach of the Dosewallips River. The work covers River Mile 1.0 to 2.0 of the Dosewallips River and floodplain upstream of Brinnon, WA. The primary deliverable is a construction-ready final habitat restoration design and associated permit applications to restore critical spawning and rearing habitat for Hood Canal summer chum and Puget Sound Chinook salmon.