Replace DLB (AB) Switchgear
Replace aged, obsolete David Little Building (DLB formerly AB) Switchgear
Description: Work includes to replace generator switchgear breakers and controls.
StateAgency · IL, US
Decision makers connected to this RFP from Illinois Capital Development Board.
These related opportunities are still open for bidding.
University of Michigan Ann Arbor
Higher EducationMI
Posted
Oct 27, 2026
Nov 27, 2026
Replace aged, obsolete David Little Building (DLB formerly AB) Switchgear
The Regents of the University of Michigan
Higher EducationMI
Posted
Oct 27, 2026
Nov 28, 2026
The University of Michigan is seeking a pre-purchase of a double-ended medium-voltage switchgear lineup with automatic throw-over, a main-tie-main arrangement, and a DC power plant for its Dearborn campus. The equipment will replace the switchgear in the Daniel Little Building, and the supplier must submit detailed submittals, obtain DTE Energy approval, manufacture the switchgear, and deliver it to a location within 50 miles of Dearborn. The supplier must hand the equipment to the installation contractor and coordinate startup, owner training, and operation and maintenance manuals; installation is assigned to that contractor.
University of Michigan Dearborn
Higher EducationMI
Posted
Oct 27, 2026
Dec 5, 2026
Replace aged, obsolete David Little Building (DLB formerly AB) Switchgear.
CountyTX
Posted
Nov 13, 2026
Dec 3, 2026
The intent of this solicitation is to obtain the professional services of a qualified engineering firm to provide engineering design and construction administration services for the upgrade of the main switchgear controls at the Denton County Administrative Complex Central Utility Plant (CUP), located at 701 Kimberly, Denton, TX 76208. The project includes replacement of outdated computer control components built into the electrical switchgear.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
429 days before RFP
The A/E selection committee recommended preparation for replacing generator switchgear breakers and controls at College of DuPage, with the source listing an $866,250 appropriation amount and $1,155,000 estimated total project cost.
CDB PROJECT NO : PROJECT DESCRIPTION: PROJECT LOCATION : APPROPRIATION AMOUNT: A/E SELECTION COMMITTEE RECOMMENDATIONS 7/8/2025 ESTIMATED TOTAL PROJECT COST: 81 0-028-031 Replace Generator Switchgear Breakers and Controls Illinois Community College Board College of DuPage - Glen Ellyn, DuPage County $866,250 $1,155,000 PROJECT SCOPE OF WORK: The College of…