Virginia Community College System
Higher EducationVA
Posted
Sep 15, 2026
Oct 14, 2026
Replace Cooling Tower at Science Building at Tidewater Community College, Virginia Beach Campus
Work includes replacing cooling tower and associated work.
Description: Sealed bids are invited for construction of the CE Replace AHUs project, Project Code M25NV120, at Northern Virginia Community College’s Annandale Campus. The work generally includes replacing air handling units 1–3, return fans, and associated controls. Bids may be submitted electronically through eVA or delivered to the Virginia Community College System in Richmond, and are due at 2:00 p.m. on November 5, 2026.
HigherEducation · VA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Virginia Community College System
Higher EducationVA
Posted
Sep 15, 2026
Oct 14, 2026
Work includes replacing cooling tower and associated work.
Virginia Community College System
Higher EducationVA
Posted
-
Oct 14, 2026
The Virginia Community College System is soliciting sealed bids to repair and replace the existing stormwater drainage system at Paul D. Camp Community College’s Hobbs Campus in Suffolk, Virginia. The work includes removal of deteriorated drainage infrastructure, installation of new underground pipe and catch basins, site grading, and related restoration. Bids are due electronically through eVA or by delivery to the Virginia Community College System by 2:00 p.m. on October 14, 2026, with a public bid opening scheduled for October 15, 2026.
Kentucky Community and Technical College System
Higher EducationKY
Posted
-
Oct 15, 2026
Work consists of approx. a new technical education building on a mostly cleared site. The building will be approximately 53,000 SF and will include Automotive and Diesel Technology, Construction Technology, HVAC, Electrical and Electronics, Industrial Maintenance Technology, and Welding labs as well as classrooms, administration, and building support spaces. The building exterior will include a mix of masonry, including some stone accents, insulated metal panel systems, and curtain wall framing. The roofing will be a two-ply modified bitumen system. The project is designed with the intent to achieve LEED Silver certification. Commissioning of the building systems and building envelope are included in the scope of work. Plumbing systems consist of domestic water, sanitary sewer, and storm sewer. Compressed air and welding gas systems are also present in labs. The HVAC system is largely geothermal water-source heat pumps and energy recovery units. Electric heaters, mini-split heat pump systems, and direct gas fired heater with exhaust ventilation will also be utilized. The electrical system will include incoming utility infrastructure and an emergency natural gas generator. Other related systems include fire alarm, data, access controls infrastructure, local sound system infrastructure, and infrastructure for classroom technology equipment.
Higher EducationFL
Posted
Sep 27, 2026
Oct 23, 2026
Work consists of demolition of the existing building.
Decision makers connected to this RFP from Virginia Community College System.