CountyAB
Aug 20, 2026
Closes
Sep 10, 2026
Township Road 40 and Range Road 253 Road Reconstruction
Cardston County proposes to repair 3.3 km of Township Road 40 south of the Village of Hill Spring and 2.0 km of Range Road 253 south of the Town of Cardston. The requested design work includes design and construction surveys, road design and drawings, cut-and-fill volumes and diagrams, and preparation of utility-crossing plans and approvals. Cardston County says it will perform construction, the final design delivery is due on February 17, 2027, and the posting displays the bid window as “Thu • Aug 20, 2026 • 3:09 pm (MT)” to “Thu • Sep 10, 2026 • 2:00:00 pm (MT)”.