CountyMO
Posted
Sep 9, 2026
Oct 2, 2026
Reconstruction of Hepperman Road
Reconstruct approx 0.67 mile of Road with grading, asphalt paving, curb and gutter, sidewalk, drainage facilities, and any other appurtenances.
Description: Cardston County proposes to repair 3.3 km of Township Road 40 south of the Village of Hill Spring and 2.0 km of Range Road 253 south of the Town of Cardston. The requested design work includes design and construction surveys, road design and drawings, cut-and-fill volumes and diagrams, and preparation of utility-crossing plans and approvals. Cardston County says it will perform construction, the final design delivery is due on February 17, 2027, and the posting displays the bid window as “Thu • Aug 20, 2026 • 3:09 pm (MT)” to “Thu • Sep 10, 2026 • 2:00:00 pm (MT)”.
County · AB, CA
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
CountyMO
Posted
Sep 9, 2026
Oct 2, 2026
Reconstruct approx 0.67 mile of Road with grading, asphalt paving, curb and gutter, sidewalk, drainage facilities, and any other appurtenances.
CityWI
Posted
Aug 28, 2026
Sep 15, 2026
Approx., 150 LF of culvert pipe; 3800 CY of excavation, 160 tons of 3/4" crushed aggregate base course; 1900 tons of 1 1/4" crushed aggregate base course; 2270 tons of breaker rub; 8920 tons of HMA pavement; construction staking, and restoration.
CityNJ
Posted
Sep 10, 2026
Oct 7, 2026
This solicitation involves road maintenance and resurfacing work including HMA milling, hot mix asphalt installation, aggregate placement, and traffic protection measures.
CityON
Posted
Sep 10, 2026
Oct 2, 2026
The Corporation of the City of St. Thomas is seeking qualified contractors through a construction Request for Pre-Qualification for the South Edgeware Road Reconstruction project. The work covers South Edgeware Road from Waterworks Park to Burwell Road and includes reconstruction of roads, sidewalks, multi-use paths, deep sanitary sewers and forcemains, watermains, storm sewers, and related infrastructure. This is the first stage of a two-stage procurement process, with a future request for tender planned for pre-qualified construction companies; it is not a grant program.
Decision makers connected to this RFP from Cardston County.