Otter Road & Racoon Road Street Improvements
Work includes asphalt and gravel reclamation, concrete removal, unclassified excavation, base course, asphalt concrete composite, pavement marking, concrete pavement, traffic control, erosion control, geogrid reinforcement, adjust signs, swppp. Description: 1 ls of mobilization; 108 ft of remove curb and gutter; 63 sy of remove sidewalk; 450 cy of unclassified excavation; 500 cy of unclassified excavation, digouts; 9400 sy of ordinary roadway shaping; 260 cy of remove and replace topsoil; 250 ton of base course - digouts; 3161 ton of base course, salvaged asphalt mix; 100 ton of gravel cushion; 3956 ton of salvage and stockpile asphalt mix and granular material; 8710 sy of full depth reclamation; 1509 ton of asphalt concrete composite; 2698 ft of pavement marking paint, 4" yellow. See attached file.