CityFL
Jun 21, 2026
Closes
Sep 2, 2026
Monitor Well Replacement Project - *REBID*
Work includes monitor well replacement.
Description: The government-portal detail page lists a single subcontracting opportunity titled Post Oak Replacement Well. It names Rayburn County MUD as the owner, places the project in Brookland, Jasper, TX, and labels the opportunity as subcontracting rather than a grant solicitation. The source shows Closing Date: 8/27/2026 and provides no bidding-start date, closing time, or primary PDF, Docx, or PPT file.
SpecialDistrict · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityFL
Jun 21, 2026
Closes
Sep 2, 2026
Work includes monitor well replacement.
Georgetown County Water And Sewer District
Special DistrictSC
Aug 25, 2026
Closes
Sep 28, 2026
The solicitation seeks sealed bids from a water and sewer district for a complete turnkey groundwater well control panel system. The described system includes a VFD and an automatic well blowoff sequence. It also includes chlorine booster pump controls for a 480-volt, three-phase power supply.
Special DistrictTX
-
Closes
Sep 2, 2026
El Paso Water Utilities is soliciting a contractor to replace the existing 30-inch McCombs well collector line in El Paso, Texas. The work includes excavation, installation of new piping, backfilling, and site restoration. The solicitation is active and closes on September 2, 2026, at 2:00 p.m. local time.
Special DistrictTX
Aug 9, 2026
Closes
Sep 2, 2026
Work consists of Installation of approximately 132 LF of 6" polyvinyl chloride (PVC) water main (class 305); installation of 2,850 LF of 8-inch PVC water main (class 305); installation of 5,056 LF of 12" PVC water main (class 305); installation of 78 LF of 8" ductile iron (DI) water main (class 350); 559 LF of 12-inch DI water main (class 350); 5,160 LF of 16" DI water main (class 350); 4,685 LF of 24" DI water main (class 350); 11,457 LF of 30" DI water main (class 350); 7,615 LF of 36" DI water main (class 350); 2,220 LF of 42" DI water main (class 350); 540 LF of 24" diameter steel casing via boring method; 160 LF of 42" diameter steel casing via boring method; 270 LF of 48" diameter steel casing via boring method etc.
Procurement and program contacts connected to Rayburn Country Mud.