CityMA
May 27, 2026
Closes
Sep 29, 2026
Dishwasher Replacement Project *REBID*
The work under this contract shall include Dishwasher replacement and related scope for nine different schools in the City.
Description: Work includes monitor well replacement.
City · FL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMA
May 27, 2026
Closes
Sep 29, 2026
The work under this contract shall include Dishwasher replacement and related scope for nine different schools in the City.
Special DistrictMA
-
Closes
Aug 18, 2026
Work includes furnishing all labor, materials, equipment and incidentals to install a new well pump, test and make fully operable a new drinking water supply well.
CityCA
Jul 16, 2026
Closes
Aug 20, 2026
The City of El Paso de Robles (Paso Robles, California) is soliciting sealed bids for the Landfill Monitoring Well Replacement Project (Bid No. UD26-01). The work includes, but is not limited to, proper abandonment of one (1) existing groundwater well and installation of two (2) new groundwater monitoring wells at locations designated in the Technical Specifications, along with any access improvements required to reach Monitoring Well MW-4. The contract must be completed within ninety (90) working days from the Notice to Proceed, with bids valid for 90 calendar days after opening.
CityNJ
Dec 2, 2024
Closes
Aug 26, 2026
Installation of 1,010 LF of 8" diameter ductile iron water main, 160 LF of 10" diameter ductile iron water main, 100 LF of 12" diameter ductile iron water main, 260 LF of 12" diameter HDPE water main installed by Horizontal Direction boring (HDD), and 890 LF of 20" diameter ductile iron water, and the replacement of curb boxes and water services. Work shall also include soil erosion and sediment control, test pits, excavation, backfilling, dewatering, chlorination, pipe pressure and leakage tests, water service connections, pipe abandonment, pipe removal and disposal, valves and fittings, site work including pavement trench restoration, final mill and surface paving, concrete curb replacement (if and where directed) and general site restoration.
Procurement and program contacts connected to City of Lake Worth Beach.