Mccombs 30-Inch Well Collector Line Replacement
-
Closes
Sep 2, 2026
El Paso Water Utilities is soliciting a contractor to replace the existing 30-inch McCombs well collector line in El Paso, Texas. The work includes excavation, installation of new piping, backfilling, and site restoration. The solicitation is active and closes on September 2, 2026, at 2:00 p.m. local time.