Open RFP

Westbound Frontage Road Water/Wastewater Utility Adjustment (Request for Proposal)

Description: Work includes approximately 1,425 LF of 24-inch diameter AWWA C200 Welded Steel reclaimed water line, 320 LF of 16-inch diameter AWWA C900 DR25 PVC (Green) Pipe sewer line, 50 LF of 24-inch split steel casing using open cut method, 40 LF 36-inch steel casing using open cut method, 35 LF of 36-inch diameter split steel casing, including fittings, isolation valves, tie-ins to existing reclaimed waterlines and sewer lines, by open cut method. The project also includes installation, maintenance and removal of temporary bypass for existing 16-inch sewer line during tie-in. The project includes removal and disposal of existing 24-inch tape-wrapped steel reclaimed water line and 16-inch PVC sanitary sewer, including fittings, valves, and concrete manholes. The project includes additive alternate No. 1, Furnish, install, maintain and remove 24-inch dual line stop with 16-inch HDPE bypass pipeline. The project includes trench safety per OSHA requirements, subsurface utility engineering, disinfection, storm water pollution prevention measures, project-wide traffic control, construction water and power, dust control, project management, mobilization, demobilization, house-keeping and project videotaping for a complete and operable project .

Buyer
El Paso Water

SpecialDistrict · TX, US

Released
Aug 9, 2026
Closes
Sep 16, 2026(30 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts