Open RFP

Mccombs 30-inch Well Collector Line Replacement

Description: Work consists of Installation of approximately 132 LF of 6" polyvinyl chloride (PVC) water main (class 305); installation of 2,850 LF of 8-inch PVC water main (class 305); installation of 5,056 LF of 12" PVC water main (class 305); installation of 78 LF of 8" ductile iron (DI) water main (class 350); 559 LF of 12-inch DI water main (class 350); 5,160 LF of 16" DI water main (class 350); 4,685 LF of 24" DI water main (class 350); 11,457 LF of 30" DI water main (class 350); 7,615 LF of 36" DI water main (class 350); 2,220 LF of 42" DI water main (class 350); 540 LF of 24" diameter steel casing via boring method; 160 LF of 42" diameter steel casing via boring method; 270 LF of 48" diameter steel casing via boring method etc.

Buyer
El Paso Water

SpecialDistrict · TX, US

Released
Aug 9, 2026
Closes
Sep 2, 2026(16 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts