CityFL
Posted
Nov 3, 2026
Dec 1, 2026
Wastewater Reclamation Facility Process Drain & Suction Valve Replacement Project RFP
Removal and disposal of two existing wastewater process valves located approximately 18 feet below grade. The work also includes the installation of one (1) 12" and one (1) 18" mechanical joint plug valve within the existing buried piping system. The 12-inch valve replacement is for the draining of Aeration Basin #2, which periodically needs to be taken out of service for cleaning and maintenance. The 18" process suction valve replacements are for the isolation of Clarifiers #1 & #2.
