Centrifuge Conveyor Replacement At the Haverhill Wastewater Division Process Building RFP
Centrifuge Conveyor Replacement.
Description: Removal and disposal of two existing wastewater process valves located approximately 18 feet below grade. The work also includes the installation of one (1) 12" and one (1) 18" mechanical joint plug valve within the existing buried piping system. The 12-inch valve replacement is for the draining of Aeration Basin #2, which periodically needs to be taken out of service for cleaning and maintenance. The 18" process suction valve replacements are for the isolation of Clarifiers #1 & #2.
City · FL, US
Adjacent opportunities open for bidding right now.
CityMA
Posted
Oct 21, 2026
Nov 6, 2026
Centrifuge Conveyor Replacement.
CityIA
Posted
Nov 4, 2026
Dec 9, 2026
Construction Manager at Risk preconstruction and construction services for the Wastewater Reclamation Facility Phosphorus Recovery Facility project.
CityOR
Posted
Jun 24, 2026
Nov 19, 2026
The project involves replacement of critical process heating infrastructure within an operating wastewater treatment facility. The work includes demolition of two existing steam boilers and installation of three new hot water boilers, integration of the new system into existing plant controls and electrical infrastructure, and provision of a fully engineered temporary heating system to maintain uninterrupted digester heating during construction.
CityFL
Posted
Sep 29, 2026
Nov 12, 2026
The principal features of the Work to be performed under this Contract shall include but not limited to the following: 1. Relocation of the Biosolids Control Room from the ground-floor electrical room to convert the upstairs locker-room to a new Control Room including the following: a. Relocate newly built-in existing lab furniture from the electrical room currently also used as a control room to the new control room, and finish areas where furniture will be removed in the electrical room. b. Demolish the shower, remove lockers and install a kitchenette with features shown on the drawings in the new control room c. Replace existing water heater and wall air conditioning unit as shown on the drawings. d. Install plumbing, electrical outlets and internet cabling as shown on the drawings. e. Perform structural work to the roof and existing observation window as shown on the drawings.
Decision makers connected to this RFP from City of Miramar.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File Retrieval