CityUT
Posted
Aug 28, 2026
Sep 16, 2026
Pre-Qualification of Prime Contractors - Old Salt Lake City Main Library Remodel RFP
Work will consist of the completion of interior remodels within the old city main library.
Description: Work will consist of program verification and finalization, design and construction administration services for a remodel of the Old Salt Lake City Library.
County · UT, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Salt Lake County.
Adjacent opportunities open for bidding right now.
CityUT
Posted
Aug 28, 2026
Sep 16, 2026
Work will consist of the completion of interior remodels within the old city main library.
CityUT
Posted
Aug 28, 2026
Sep 16, 2026
Salt Lake City Corporation is seeking pre-qualification responses from prime contractors for the interior remodel of the Old Salt Lake City Main Library. The open RFPQ requires submission of pre-qualification documents and includes the solicitation document and design plans as supporting documentation. The opportunity opened on August 28, 2026, and submissions are due September 16, 2026, at 2:00 PM MDT.
CitySC
Posted
Jul 29, 2026
Sep 15, 2026
Seeking a qualified mechanical (plumbing) contractor to evaluate, design, and implement improvements to the domestic water service and distribution system. The objective of this project is to identify and correct deficiencies affecting water flow, pressure, and overall system performance throughout the facility.
West County Wastewater District
Special DistrictCA
Posted
Jun 15, 2026
Sep 25, 2026
Work includes 1 LS site a - install launch assembly. Install pig-launcher assembly, including, but not limited to demolition, pipes, fittings, couplings, valves and materials, bollards, valve box, linestop with temporary bypass piping, thrust restraints, water from ebmud hydrant, test station, site clearing, storm water pollution prevention measures, temporary support of existing utilities, excavation, sheeting and shoring, bedding, backfill, compaction, removal and disposal of trench spoils, old pipe and structures, surface restoration, cleanup, testing, asphalt concrete paving, temporary fencing, site security, lighting, and contractor support during ili inspection. See attached file.