The following scope of work is required to complete the San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation Project:
Provide all materials, equipment, and labor necessary to:
Install approximately 420 LF of 24’ CIPP Liner in the 24” ACP trunk sewer on San Pablo Dam Road from MHM17105 to MHM17106
Provide Traffic control
Temporary Bypass/pumping
CCTV post-installation inspection video
Acquire Required Permits (see technical specifications section)
Complete construction installation work during night time when traffic and sewage flows are below average as determined by WCW
Complete project within 30 Calendar days of NTP
The 24-inch ACP Class 5000 Pipeline was installed in 1970. A CCTV assessment on 5/21/26 determined that the previously installed liner has failed at several locations and that the pipeline's general condition is poor. Based on this assessment, WCW determined that the pipeline should be rehabilitated with a CIPP liner.
Work includes 1 LS mobilization and demobilization, including but not limited to bonds, insurance, survey staking, storm water bmps, noise and dust control, temporary facilities such as water, power, fencing and sanitary facilities, as specified in general requirements; 1 LS sedimentation basin no. 1 demolition; 1 LS sedimentation basin no. 1 chain and flight mechanism and accessories installation; 1 LS sedimentation basin no. 2 concrete crack repair. See attached file.
Buyer Attributes
Key metrics and characteristics
City
The city where this buyer is located.
Richmond
County
The county where this buyer is located.
Contra Costa
Address
Physical address of this buyer.
2910 Hilltop Dr
Phone Number
Contact phone number for this buyer.
(510) 222-6700
Zip Code
Postal code for this buyer's location.
94806
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
CautiousAggressive
Higher is better Unlock
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
ConservativeEarly Adopter
Higher is better Unlock
Startup Friendliness
How often this buyer champions startups and early adoption.
Board meetings and strategic plans from West County Wastewater District
West County Wastewater District Board of Directors Meeting
Date: Oct 21, 2026Type: Meeting mention
The board meeting addressed several administrative and ceremonial items. Key topics included the adoption of a proclamation honoring the life, public health legacy, and community service of Dr. Desmond E. Carson, M.D. The board also reviewed the check register report for September 2026 and a report regarding contracts authorized by the General Manager. Directors provided reports on various committee activities, including finance and administrative committee updates, a retreat, the North Richmond Mitigation committee, and participation in an innovative technology seminar.
West County Wastewater Infrastructure, Operations & Environment Committee Special Meeting
Date: Oct 15, 2026Type: Meeting mention
The committee reviewed preparations for the upcoming wet weather season, focusing on collection system and treatment plant readiness, emergency response planning, and preventive maintenance activities. The meeting included a discussion regarding the Great Shakeout earthquake safety drill and provided a status update on the Wipes Act, which is intended to establish national standards for the labeling of flushable and non-flushable wipes.
West County Wastewater Finance and Administration Committee Committee Meeting
Key Contacts
Public-sector contacts connected to West County Wastewater District.
The committee reviewed and accepted the minutes from the previous meeting, noting a required caption correction. The primary discussion focused on the Internal Revenue Service arbitrage rebate obligation regarding 2021 wastewater revenue bonds. Finance staff explained the financial implications, clarifying that while interest was earned on bond proceeds, a portion must be remitted to the IRS as required by federal tax regulations. The committee emphasized fiscal responsibility and requested that future presentations clearly define terminology like 'arbitrage' and 'slugs' to ensure transparency for the public regarding the district's financial practices.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track West County Wastewater District meetings, strategic plans, and budget discussions before the public bid appears.