Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include dam rehabilitation. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of dam rehabilitation project involving removal of surface/ground water, excavation, concrete work, and structural repairs. Requires general contractor qualification and experience with water control systems, earthwork, and concrete construction for dam infrastructure projects.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
Close: Feb 10, 2026
Work consists of dam rehabilitation project involving removal of surface/ground water, excavation, concrete work, and structural repairs. Requires general contractor qualification and experience with water control systems, earthwork, and concrete construction for dam infrastructure projects.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Dam rehabilitation including new principal spillway construction. Removal of the existing principal spillway, construction of new reinforced-concrete drop spillway, decommissioning of the auxiliary spillway and small fishing pond, embankment modifications, permanent stabilization and associated work items.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Dam rehabilitation including new principal spillway construction. Removal of the existing principal spillway, construction of new reinforced-concrete drop spillway, decommissioning of the auxiliary spillway and small fishing pond, embankment modifications, permanent stabilization and associated work items.
AvailableIn-city dam rehabilitation at central park reservoir in central park.
Posted Date
Jan 12, 2026
Due Date
Feb 18, 2026
Release: Jan 12, 2026
Close: Feb 18, 2026
In-city dam rehabilitation at central park reservoir in central park.
AvailableRemoval and replacement of the existing Sunset Lake Dam and spillway, which includes the following: cast-in-place labyrinth weir, pre-cast box culvert for Washington Ave, intermediate channel, secondary sheet pile weir and limestone landscaping and retaining wall. The Project will also include removal and installation of outlet control structure for Prairie St..
Posted Date
Jan 12, 2026
Due Date
Feb 19, 2026
Release: Jan 12, 2026
Close: Feb 19, 2026
Removal and replacement of the existing Sunset Lake Dam and spillway, which includes the following: cast-in-place labyrinth weir, pre-cast box culvert for Washington Ave, intermediate channel, secondary sheet pile weir and limestone landscaping and retaining wall. The Project will also include removal and installation of outlet control structure for Prairie St..
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →