#645 Resurface (asphalt) on Sh-54: From the Us-62 Junction RFP
Posted
-
Jan 21, 2027
Work includes 33,410 GAL (sp) polymer mod. Cationic rapid set - 1s, 4,230 SY cold milling pavement, 46,740 lf rumble strip-centerline hma-con, 142,136 LF (sp) traffic stripe(plural-component)(6" wide), 6,233 ea (pl)const. Zone pav. Mkrs(flex tab)typ. 2-1.




