Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal and replacement of the existing Sunset Lake Dam and spillway, which includes the following: cast-in-place labyrinth weir, pre-cast box culvert for Washington Ave, intermediate channel, secondary sheet pile weir and limestone landscaping and retaining wall. The Project will also include removal and installation of outlet control structure for Prairie St..
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Major work items include: Dewater reservoir and construction area. Excavate a portion of the existing dam embankment and foundation to remove the existing outlet works pipe and allow construction of the new outlet works. Reconstruct the dam embankment, including. Construct precast concrete outlet works riser for a new outlet works. Construct concrete encased, precast reinforced concrete pipe outlet works conduit. Construct precast concrete low-level outlet works inlet structure and concrete encased PVC pipe conduit. Construct grouted riprap outlet works stilling basin. Excavation, fill, and grading for new auxiliary spillway. Place gravel road surfacing within specified limits on the crest of the dam. Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of soil and seeding.
Posted Date
Jun 5, 2025
Due Date
Jan 21, 2026
Release: Jun 5, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 21, 2026
Major work items include: Dewater reservoir and construction area. Excavate a portion of the existing dam embankment and foundation to remove the existing outlet works pipe and allow construction of the new outlet works. Reconstruct the dam embankment, including. Construct precast concrete outlet works riser for a new outlet works. Construct concrete encased, precast reinforced concrete pipe outlet works conduit. Construct precast concrete low-level outlet works inlet structure and concrete encased PVC pipe conduit. Construct grouted riprap outlet works stilling basin. Excavation, fill, and grading for new auxiliary spillway. Place gravel road surfacing within specified limits on the crest of the dam. Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of soil and seeding.
AvailableWork consists of 0.695 centerline miles of street reconstruction including storm sewer, sanitary sewer and water main replacement along CSAH 51. The project will convert the existing rural section to an urban section with curb and gutter and sidewalk. Four retaining walls will be constructed with the project. New street lighting will also be installed along CSAH 51. Along CSAH 19 only, 0.177 centerline miles of mill and overlay will be constructed.
Posted Date
Jan 10, 2026
Due Date
Feb 3, 2026
Release: Jan 10, 2026
Close: Feb 3, 2026
Work consists of 0.695 centerline miles of street reconstruction including storm sewer, sanitary sewer and water main replacement along CSAH 51. The project will convert the existing rural section to an urban section with curb and gutter and sidewalk. Four retaining walls will be constructed with the project. New street lighting will also be installed along CSAH 51. Along CSAH 19 only, 0.177 centerline miles of mill and overlay will be constructed.
AvailableProject involves the construction of improvements to Griffith Lake Dam located in Kent and Sussex Counties. The improvements include, but are not limited to _Demolition/removal of the existing spillway and the north and south abutment training walls; construction of new pile supported cast-in-place concrete spillway, runout apron, outlet structure and abutment walls; installation of a galvanized steel bar screen trash rack and a multi-leaf self-contained stainless steel weir gate and associated site work.
Posted Date
Nov 10, 2025
Due Date
Jan 21, 2026
Release: Nov 10, 2025
Close: Jan 21, 2026
Project involves the construction of improvements to Griffith Lake Dam located in Kent and Sussex Counties. The improvements include, but are not limited to _Demolition/removal of the existing spillway and the north and south abutment training walls; construction of new pile supported cast-in-place concrete spillway, runout apron, outlet structure and abutment walls; installation of a galvanized steel bar screen trash rack and a multi-leaf self-contained stainless steel weir gate and associated site work.
AvailableConstruction of improvements to Griffith Lake Dam, including demolition and removal of existing spillway and abutment walls, construction of a new pile-supported concrete spillway, runout apron, outlet structure, and abutment walls, and installation of a trash rack and weir gate, plus associated site work.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Construction of improvements to Griffith Lake Dam, including demolition and removal of existing spillway and abutment walls, construction of a new pile-supported concrete spillway, runout apron, outlet structure, and abutment walls, and installation of a trash rack and weir gate, plus associated site work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.