Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Major work items include: Dewater reservoir and construction area. Excavate a portion of the existing dam embankment and foundation to remove the existing outlet works pipe and allow construction of the new outlet works. Reconstruct the dam embankment, including. Construct precast concrete outlet works riser for a new outlet works. Construct concrete encased, precast reinforced concrete pipe outlet works conduit. Construct precast concrete low-level outlet works inlet structure and concrete encased PVC pipe conduit. Construct grouted riprap outlet works stilling basin. Excavation, fill, and grading for new auxiliary spillway. Place gravel road surfacing within specified limits on the crest of the dam. Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of soil and seeding.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Removal and replacement of the existing Sunset Lake Dam and spillway, which includes the following: cast-in-place labyrinth weir, pre-cast box culvert for Washington Ave, intermediate channel, secondary sheet pile weir and limestone landscaping and retaining wall. The Project will also include removal and installation of outlet control structure for Prairie St..
Posted Date
Jan 12, 2026
Due Date
Feb 19, 2026
Release: Jan 12, 2026
Close: Feb 19, 2026
Removal and replacement of the existing Sunset Lake Dam and spillway, which includes the following: cast-in-place labyrinth weir, pre-cast box culvert for Washington Ave, intermediate channel, secondary sheet pile weir and limestone landscaping and retaining wall. The Project will also include removal and installation of outlet control structure for Prairie St..
AvailableReconstruction of Drive.
Posted Date
-
Due Date
Jan 29, 2026
Release: -
Close: Jan 29, 2026
Reconstruction of Drive.
AvailableStreet & utility reconstruction.
Posted Date
Jan 9, 2026
Due Date
Jan 27, 2026
Release: Jan 9, 2026
Close: Jan 27, 2026
Street & utility reconstruction.
AvailableReconstruction of bridge
Posted Date
Jan 9, 2026
Due Date
Feb 12, 2026
Release: Jan 9, 2026
Close: Feb 12, 2026
Reconstruction of bridge
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis