Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
National Operations Center
Lease the following space: Minimum SF (ABOA):13,000 sq ft., Maximum SF (ABOA): 16,700 sq ft., Space Type: Office (primary), Parking Spaces: 108, Full term: 5 years.
Posted Date
Mar 9, 2026
Due Date
Mar 23, 2026
Release: Mar 9, 2026
National Operations Center
Close: Mar 23, 2026
Lease the following space: Minimum SF (ABOA):13,000 sq ft., Maximum SF (ABOA): 16,700 sq ft., Space Type: Office (primary), Parking Spaces: 108, Full term: 5 years.
AvailableNational Operations Center
Major items of work include: dewater reservoir and construction area. Excavate a portion of the existing dam embankment and foundation to remove the existing outlet works pipe and allow construction of the new outlet works. Reconstruct the dam embankment, including a. Placement of compacted fill from onsite borrow sources. B. Placement of lime-amended backfill. C. Placement of imported rock for riprap slope protection within designated areas on the upstream slope. D. Placement and compaction of imported sand for internal filter and drain features. E. Construction of a toe drain. 4. Construct a precast concrete outlet works riser 5. Construct concrete encased, precast reinforced concrete pipe outlet works conduit. 6. Construct grouted riprap outlet works stilling basin. 7. Excavation, fill, and grading of the spillway. 8. Place gravel road surfacing within specified limits on the crest of the dam. 9. Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of soil and seeding.
Posted Date
Mar 4, 2026
Due Date
Mar 13, 2026
Release: Mar 4, 2026
National Operations Center
Close: Mar 13, 2026
Major items of work include: dewater reservoir and construction area. Excavate a portion of the existing dam embankment and foundation to remove the existing outlet works pipe and allow construction of the new outlet works. Reconstruct the dam embankment, including a. Placement of compacted fill from onsite borrow sources. B. Placement of lime-amended backfill. C. Placement of imported rock for riprap slope protection within designated areas on the upstream slope. D. Placement and compaction of imported sand for internal filter and drain features. E. Construction of a toe drain. 4. Construct a precast concrete outlet works riser 5. Construct concrete encased, precast reinforced concrete pipe outlet works conduit. 6. Construct grouted riprap outlet works stilling basin. 7. Excavation, fill, and grading of the spillway. 8. Place gravel road surfacing within specified limits on the crest of the dam. 9. Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of soil and seeding.
AvailableNational Operations Center
Online auction services for competitive onshore oil, gas and geothermal lease sales.
Posted Date
Feb 12, 2026
Due Date
Mar 12, 2026
Release: Feb 12, 2026
National Operations Center
Close: Mar 12, 2026
Online auction services for competitive onshore oil, gas and geothermal lease sales.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
National Operations Center
GAOA-HENRY MOUNTAINS FIELD STATION, UT
Effective Date
Dec 5, 2025
Expires
Effective: Dec 5, 2025
National Operations Center
Expires:
GAOA-HENRY MOUNTAINS FIELD STATION, UT
AvailableNational Operations Center
BLM CULTURAL RESOURCE MANAGEMENT (CRM) SERVICES BLANKET PURCHASE AGREEMENT (BPA)
Effective Date
Mar 1, 2021
Expires
Effective: Mar 1, 2021
National Operations Center
Expires:
BLM CULTURAL RESOURCE MANAGEMENT (CRM) SERVICES BLANKET PURCHASE AGREEMENT (BPA)
AvailableNational Operations Center
BLM CULTURAL RESOURCE MANAGEMENT (CRM) SERVICES BLANKET PURCHASE AGREEMENT (BPA)
Effective Date
Mar 1, 2021
Expires
Effective: Mar 1, 2021
National Operations Center
Expires:
BLM CULTURAL RESOURCE MANAGEMENT (CRM) SERVICES BLANKET PURCHASE AGREEMENT (BPA)
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Track National Operations Center's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database