Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Colorado State Office's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Track vendor wins and renewal opportunities
Colorado State Office
UFO SAWMILL MESA CAMP CLEANUP RR
Effective Date
Mar 24, 2025
Expires
Effective: Mar 24, 2025
Colorado State Office
Expires:
UFO SAWMILL MESA CAMP CLEANUP RR
Colorado State Office
BLM-CO WRFO CABANA INSTALLATION
Effective Date
Jul 11, 2025
Expires
Effective: Jul 11, 2025
Colorado State Office
Expires:
BLM-CO WRFO CABANA INSTALLATION
AvailableColorado State Office
I621253 - BODY REPAIR DUE TO DEER HIT
Effective Date
May 19, 2025
Expires
Effective: May 19, 2025
Colorado State Office
Expires:
I621253 - BODY REPAIR DUE TO DEER HIT
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Active opportunities open for bidding
Colorado State Office
Purchase order for six UL 1778-compliant static double-conversion online UPS systems (brand name or equal). Systems shall accept 480VAC three-phase input, provide 120VAC single-phase output, and integrate with a 125VDC battery system. Includes external bypass transformer.
Posted Date
Jan 20, 2026
Due Date
Jan 27, 2026
Release: Jan 20, 2026
Colorado State Office
Close: Jan 27, 2026
Purchase order for six UL 1778-compliant static double-conversion online UPS systems (brand name or equal). Systems shall accept 480VAC three-phase input, provide 120VAC single-phase output, and integrate with a 125VDC battery system. Includes external bypass transformer.
AvailableColorado State Office
Seeding to the lee, deer creek, and snowbelly fire zones.
Posted Date
Dec 30, 2025
Due Date
Jan 27, 2026
Release: Dec 30, 2025
Colorado State Office
Close: Jan 27, 2026
Seeding to the lee, deer creek, and snowbelly fire zones.
AvailableColorado State Office
Excavate the portal area and then install a properly designed and constructed portal structure and replacement gate, with steel sets extending from approximately Station 0+84 to Station 1+12.5. It is recommended that these sets be lagged with steel channel or other steel material and that cavities overhead be filled with polyurea silicate void filling foam to prevent impact loading. As a matter of routine safety, the entire adit should be thoroughly scaled and afterwards, any rockfall or debris on the invert should be removed to eliminate unnecessary tripping hazards. Existing tripping hazards should be cleaned up as well. Rockbolting and meshing should be installed as an appropriate risk reduction measure to protect personnel during safety inspections.
Posted Date
Sep 22, 2025
Due Date
Oct 22, 2025
Release: Sep 22, 2025
Colorado State Office
Close: Oct 22, 2025
Excavate the portal area and then install a properly designed and constructed portal structure and replacement gate, with steel sets extending from approximately Station 0+84 to Station 1+12.5. It is recommended that these sets be lagged with steel channel or other steel material and that cavities overhead be filled with polyurea silicate void filling foam to prevent impact loading. As a matter of routine safety, the entire adit should be thoroughly scaled and afterwards, any rockfall or debris on the invert should be removed to eliminate unnecessary tripping hazards. Existing tripping hazards should be cleaned up as well. Rockbolting and meshing should be installed as an appropriate risk reduction measure to protect personnel during safety inspections.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.