Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves the construction of improvements to Griffith Lake Dam located in Kent and Sussex Counties. The improvements include, but are not limited to _Demolition/removal of the existing spillway and the north and south abutment training walls; construction of new pile supported cast-in-place concrete spillway, runout apron, outlet structure and abutment walls; installation of a galvanized steel bar screen trash rack and a multi-leaf self-contained stainless steel weir gate and associated site work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of improvements to Griffith Lake Dam, including demolition and removal of existing spillway and abutment walls, construction of a new pile-supported concrete spillway, runout apron, outlet structure, and abutment walls, and installation of a trash rack and weir gate, plus associated site work.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Construction of improvements to Griffith Lake Dam, including demolition and removal of existing spillway and abutment walls, construction of a new pile-supported concrete spillway, runout apron, outlet structure, and abutment walls, and installation of a trash rack and weir gate, plus associated site work.
AvailableLake lansing water control structure and site improvements.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Lake lansing water control structure and site improvements.
AvailableWork includes 24,000 SY partial depth pavement repair; 650 SY full depth pavement repair; 100 SY pavement subgrade repair; 2,500 CY embankment repair; 6,850 SF abutment and spillway concrete patching; 350 SF service bridge piers, deck topside, deck fascia,sidewalks and curbs concrete patching; 880 SF concrete crack repair.
Posted Date
Oct 31, 2025
Due Date
Dec 17, 2025
Release: Oct 31, 2025
Close: Dec 17, 2025
Work includes 24,000 SY partial depth pavement repair; 650 SY full depth pavement repair; 100 SY pavement subgrade repair; 2,500 CY embankment repair; 6,850 SF abutment and spillway concrete patching; 350 SF service bridge piers, deck topside, deck fascia,sidewalks and curbs concrete patching; 880 SF concrete crack repair.
AvailableThe project involves rehabilitation of the dam and includes the following major components: clearing and grubbing of the project area. Installation of care of water measures (cofferdams, diversions, etc. ) as necessary to protect the work and facilitate construction. Construction of access road along the downstream toe. Topsoil and seed all areas disturbed by construction activities.
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
Close: Jan 6, 2026
The project involves rehabilitation of the dam and includes the following major components: clearing and grubbing of the project area. Installation of care of water measures (cofferdams, diversions, etc. ) as necessary to protect the work and facilitate construction. Construction of access road along the downstream toe. Topsoil and seed all areas disturbed by construction activities.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis