Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of dam rehabilitation project involving removal of surface/ground water, excavation, concrete work, and structural repairs. Requires general contractor qualification and experience with water control systems, earthwork, and concrete construction for dam infrastructure projects.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes : install a new roller compacted concrete (rcc) stepped chute spillway with ogee weir crest and stilling basin within the existing dam embankment. Proposed rcc spillway is approx 50' high and 290 feet wide; construct approx 8,000 LF of new permanent gravel access road including ditching, culverts and low water stream crossings; install two (2) perennial stream crossings. One 60" rcp with rip rap and the other constructed to the usda-natural resources conservation service (nrcs) conservation practice standard 578 ford stream crossing; see attached file.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 5, 2026
Work includes : install a new roller compacted concrete (rcc) stepped chute spillway with ogee weir crest and stilling basin within the existing dam embankment. Proposed rcc spillway is approx 50' high and 290 feet wide; construct approx 8,000 LF of new permanent gravel access road including ditching, culverts and low water stream crossings; install two (2) perennial stream crossings. One 60" rcp with rip rap and the other constructed to the usda-natural resources conservation service (nrcs) conservation practice standard 578 ford stream crossing; see attached file.
AvailableDam rehabilitation including new principal spillway construction. Removal of the existing principal spillway, construction of new reinforced-concrete drop spillway, decommissioning of the auxiliary spillway and small fishing pond, embankment modifications, permanent stabilization and associated work items.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Dam rehabilitation including new principal spillway construction. Removal of the existing principal spillway, construction of new reinforced-concrete drop spillway, decommissioning of the auxiliary spillway and small fishing pond, embankment modifications, permanent stabilization and associated work items.
AvailableIn-city dam rehabilitation at central park reservoir in central park.
Posted Date
Jan 12, 2026
Due Date
Feb 18, 2026
Release: Jan 12, 2026
Close: Feb 18, 2026
In-city dam rehabilitation at central park reservoir in central park.
AvailableDam filter berm project.
Posted Date
Jan 13, 2026
Due Date
Feb 9, 2026
Release: Jan 13, 2026
Close: Feb 9, 2026
Dam filter berm project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.