Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Dam rehabilitation including new principal spillway construction. Removal of the existing principal spillway, construction of new reinforced-concrete drop spillway, decommissioning of the auxiliary spillway and small fishing pond, embankment modifications, permanent stabilization and associated work items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The rehabilitation will address concrete cracking in the spillway and other structural deficiencies identified in recent safety inspections as well as provide additional outdoor recreational opportunities for the public to enjoy.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
The rehabilitation will address concrete cracking in the spillway and other structural deficiencies identified in recent safety inspections as well as provide additional outdoor recreational opportunities for the public to enjoy.
Premium
Access the largest public sector contact database
Dam rehabilitation.
Posted Date
Dec 3, 2025
Due Date
Jan 2, 2026
Release: Dec 3, 2025
Close: Jan 2, 2026
Dam rehabilitation.
AvailableWork consists of Copper city ditch diversion dam and heading rehabilitation.
Posted Date
Dec 5, 2025
Due Date
Dec 19, 2025
Release: Dec 5, 2025
Close: Dec 19, 2025
Work consists of Copper city ditch diversion dam and heading rehabilitation.
Rehabilitation of the dam. Scope shall include installing temporary cofferdams and dewatering, joint (district and contractor) inspection of the structure to determine the extent of repairs required, concrete surface preparation, concrete surface patching, concrete crack repairs, concrete surface coating, surface preparation, repair and coating of structural steel and miscellaneous metals, repair six gates and replace seals, new fencing, new warning signs, placement and repair of riprap, and construction of a new control building with installation of existing control panels, new conduits, and new wiring.
Posted Date
Nov 7, 2025
Due Date
Dec 19, 2025
Release: Nov 7, 2025
Close: Dec 19, 2025
Rehabilitation of the dam. Scope shall include installing temporary cofferdams and dewatering, joint (district and contractor) inspection of the structure to determine the extent of repairs required, concrete surface preparation, concrete surface patching, concrete crack repairs, concrete surface coating, surface preparation, repair and coating of structural steel and miscellaneous metals, repair six gates and replace seals, new fencing, new warning signs, placement and repair of riprap, and construction of a new control building with installation of existing control panels, new conduits, and new wiring.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis