Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation of the dam. Scope shall include installing temporary cofferdams and dewatering, joint (district and contractor) inspection of the structure to determine the extent of repairs required, concrete surface preparation, concrete surface patching, concrete crack repairs, concrete surface coating, surface preparation, repair and coating of structural steel and miscellaneous metals, repair six gates and replace seals, new fencing, new warning signs, placement and repair of riprap, and construction of a new control building with installation of existing control panels, new conduits, and new wiring.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Dam rehabilitation.
Posted Date
Dec 3, 2025
Due Date
Jan 2, 2026
Release: Dec 3, 2025
Close: Jan 2, 2026
Dam rehabilitation.
AvailableWork consists of Copper city ditch diversion dam and heading rehabilitation.
Posted Date
Dec 5, 2025
Due Date
Dec 19, 2025
Release: Dec 5, 2025
Close: Dec 19, 2025
Work consists of Copper city ditch diversion dam and heading rehabilitation.
AvailableThe West Virginia Purchasing Division, on behalf of the West Virginia Conservation Agency, is soliciting construction services to rehabilitate Brush Creek Site 15 Dam in Mercer County, WV; scope includes clearing and grubbing, structure removal, spillway and embankment rehabilitation, erosion and sediment controls, and associated civil/geotechnical work. The solicitation is an open state CRFQ with a mandatory pre-bid event noted in procurement documents and a final bid due on January 7, 2026.
Posted Date
Sep 30, 2025
Due Date
Jan 7, 2026
Release: Sep 30, 2025
Close: Jan 7, 2026
The West Virginia Purchasing Division, on behalf of the West Virginia Conservation Agency, is soliciting construction services to rehabilitate Brush Creek Site 15 Dam in Mercer County, WV; scope includes clearing and grubbing, structure removal, spillway and embankment rehabilitation, erosion and sediment controls, and associated civil/geotechnical work. The solicitation is an open state CRFQ with a mandatory pre-bid event noted in procurement documents and a final bid due on January 7, 2026.
The project involves rehabilitation of the dam and includes the following major components: clearing and grubbing of the project area. Installation of care of water measures (cofferdams, diversions, etc. ) as necessary to protect the work and facilitate construction. Construction of access road along the downstream toe. Topsoil and seed all areas disturbed by construction activities.
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
Close: Jan 6, 2026
The project involves rehabilitation of the dam and includes the following major components: clearing and grubbing of the project area. Installation of care of water measures (cofferdams, diversions, etc. ) as necessary to protect the work and facilitate construction. Construction of access road along the downstream toe. Topsoil and seed all areas disturbed by construction activities.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis