Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Dam rehabilitation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal of upper reservoir dam and construction of new stream channel through the former impoundment.
Posted Date
Nov 13, 2025
Due Date
Dec 11, 2025
Release: Nov 13, 2025
Close: Dec 11, 2025
Removal of upper reservoir dam and construction of new stream channel through the former impoundment.
Premium
Access the largest public sector contact database
Work consists of Copper city ditch diversion dam and heading rehabilitation.
Posted Date
Dec 5, 2025
Due Date
Dec 19, 2025
Release: Dec 5, 2025
Close: Dec 19, 2025
Work consists of Copper city ditch diversion dam and heading rehabilitation.
AvailableRehabilitation of the dam. Scope shall include installing temporary cofferdams and dewatering, joint (district and contractor) inspection of the structure to determine the extent of repairs required, concrete surface preparation, concrete surface patching, concrete crack repairs, concrete surface coating, surface preparation, repair and coating of structural steel and miscellaneous metals, repair six gates and replace seals, new fencing, new warning signs, placement and repair of riprap, and construction of a new control building with installation of existing control panels, new conduits, and new wiring.
Posted Date
Nov 7, 2025
Due Date
Dec 17, 2025
Release: Nov 7, 2025
Close: Dec 17, 2025
Rehabilitation of the dam. Scope shall include installing temporary cofferdams and dewatering, joint (district and contractor) inspection of the structure to determine the extent of repairs required, concrete surface preparation, concrete surface patching, concrete crack repairs, concrete surface coating, surface preparation, repair and coating of structural steel and miscellaneous metals, repair six gates and replace seals, new fencing, new warning signs, placement and repair of riprap, and construction of a new control building with installation of existing control panels, new conduits, and new wiring.
AvailableConstruction services for the Augusta Reservoir Dam Improvement Project (Utilities Department). Procurement requires sealed bids (no email), bid documents obtained exclusively from Augusta Blueprint (non-refundable $100 fee), mandatory pre-bid conference and mandatory site visit, 5% bid bond on submission, 100% performance and payment bonds on award, Georgia E-Verify compliance for contractors/subcontractors, bids non-withdrawable for 90 days, and in-person bid opening with a Teams viewing option.
Posted Date
Dec 4, 2025
Due Date
Jan 20, 2026
Release: Dec 4, 2025
Close: Jan 20, 2026
Construction services for the Augusta Reservoir Dam Improvement Project (Utilities Department). Procurement requires sealed bids (no email), bid documents obtained exclusively from Augusta Blueprint (non-refundable $100 fee), mandatory pre-bid conference and mandatory site visit, 5% bid bond on submission, 100% performance and payment bonds on award, Georgia E-Verify compliance for contractors/subcontractors, bids non-withdrawable for 90 days, and in-person bid opening with a Teams viewing option.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis