Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Dam filter berm project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of dam rehabilitation project involving removal of surface/ground water, excavation, concrete work, and structural repairs. Requires general contractor qualification and experience with water control systems, earthwork, and concrete construction for dam infrastructure projects.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
Close: Feb 10, 2026
Work consists of dam rehabilitation project involving removal of surface/ground water, excavation, concrete work, and structural repairs. Requires general contractor qualification and experience with water control systems, earthwork, and concrete construction for dam infrastructure projects.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Request for proposals for the replacement of the US 60 EB bridge over Clear Creek in Shelby County.
Posted Date
Jan 29, 2026
Due Date
Jan 29, 2026
Release: Jan 29, 2026
Close: Jan 29, 2026
Request for proposals for the replacement of the US 60 EB bridge over Clear Creek in Shelby County.
AvailableWork includes : install a new roller compacted concrete (rcc) stepped chute spillway with ogee weir crest and stilling basin within the existing dam embankment. Proposed rcc spillway is approx 50' high and 290 feet wide; construct approx 8,000 LF of new permanent gravel access road including ditching, culverts and low water stream crossings; install two (2) perennial stream crossings. One 60" rcp with rip rap and the other constructed to the usda-natural resources conservation service (nrcs) conservation practice standard 578 ford stream crossing; see attached file.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
Work includes : install a new roller compacted concrete (rcc) stepped chute spillway with ogee weir crest and stilling basin within the existing dam embankment. Proposed rcc spillway is approx 50' high and 290 feet wide; construct approx 8,000 LF of new permanent gravel access road including ditching, culverts and low water stream crossings; install two (2) perennial stream crossings. One 60" rcp with rip rap and the other constructed to the usda-natural resources conservation service (nrcs) conservation practice standard 578 ford stream crossing; see attached file.
AvailableWork includes dam decommissioning project involving removal of quartermaster creek watershed floodwater retarding dam 19b. Requires general contractor qualification for clearing, structure removal, excavation of 18,800 SY of dam embankment, drainfill installation, topsoil placement, rock riprap, and site restoration including hydro-seeding.
Posted Date
Jan 13, 2026
Due Date
Feb 12, 2026
Release: Jan 13, 2026
Close: Feb 12, 2026
Work includes dam decommissioning project involving removal of quartermaster creek watershed floodwater retarding dam 19b. Requires general contractor qualification for clearing, structure removal, excavation of 18,800 SY of dam embankment, drainfill installation, topsoil placement, rock riprap, and site restoration including hydro-seeding.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →