The project involves constructing a new raw water well facility, including installation of the submersible well pump and motor, vertical column discharge piping, above and below grade mechanical piping, valves, meters, fittings, and the connection to the existing raw water main. Additional work includes cast-in-place concrete, chain-link fencing and gates, all required electrical equipment, panels, conduits, and associated components for full facility operation. The project also encompasses site clearing and grubbing, site restoration, tree protection, concrete repair, erosion and sediment control measures, and all other work.