Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
RFP for Ground Water Production Well SM-14 drilling services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 1 LS perform voc treatment using the granular activated carbon (gac) absorption system. ; 52 LF drill 42" dia. hole (minimum), furnish and install 36" outside diameter (od) x 5/16" (minimum) low carbon steel (lcs) conductor casing and grout into place to 50' bgs (including 2 ft of stick-up above ground surface) with 10.3-sack neat cement, for the per lineal foot unit price of; 750 LF using the reverse circulation method, drill the pilot borehole from 50' to 800' bgs with a 14" nominal diameter drill bit, collect formation samples, monitor fluid properties, conduct drift surveys and perform related work for the per lineal foot unit price. See outside link.
Posted Date
Dec 2, 2025
Due Date
Jan 5, 2026
Release: Dec 2, 2025
Close: Jan 5, 2026
Premium
Access the largest public sector contact database
Work includes 1 LS perform voc treatment using the granular activated carbon (gac) absorption system. ; 52 LF drill 42" dia. hole (minimum), furnish and install 36" outside diameter (od) x 5/16" (minimum) low carbon steel (lcs) conductor casing and grout into place to 50' bgs (including 2 ft of stick-up above ground surface) with 10.3-sack neat cement, for the per lineal foot unit price of; 750 LF using the reverse circulation method, drill the pilot borehole from 50' to 800' bgs with a 14" nominal diameter drill bit, collect formation samples, monitor fluid properties, conduct drift surveys and perform related work for the per lineal foot unit price. See outside link.
AvailableConstruction of a culinary water production well to serve as a backup well.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Close: Dec 16, 2025
Construction of a culinary water production well to serve as a backup well.
AvailableWork includes approx. 1,010 LF of drill 6" diameter minimum exploration pilot borehole; 850 LF of drill, ream, and condition 19" minimum diameter bore hole; 160 LF of drill, ream 26" diameter borehole; 160 LF of drill and install 22" minimum temporary conductor casing; 602 LF of furnish and install 14" HSLA production casing; 400 LF of furnish and install 14" HSLA production screen; 750 CF of furnish and install gravel pack filter material; 375 CF of furnish and install surface seal-grout; see outside links for more details.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work includes approx. 1,010 LF of drill 6" diameter minimum exploration pilot borehole; 850 LF of drill, ream, and condition 19" minimum diameter bore hole; 160 LF of drill, ream 26" diameter borehole; 160 LF of drill and install 22" minimum temporary conductor casing; 602 LF of furnish and install 14" HSLA production casing; 400 LF of furnish and install 14" HSLA production screen; 750 CF of furnish and install gravel pack filter material; 375 CF of furnish and install surface seal-grout; see outside links for more details.
AvailableProduction well includes the following items of work: Drilling of new production well; Installation of well casing and fittings, inclusive; Installation of well pump and appurtenances; Installation of piping to connection point at well building; Installation of pitless adapter.
Posted Date
Nov 14, 2025
Due Date
Dec 12, 2025
Release: Nov 14, 2025
Close: Dec 12, 2025
Production well includes the following items of work: Drilling of new production well; Installation of well casing and fittings, inclusive; Installation of well pump and appurtenances; Installation of piping to connection point at well building; Installation of pitless adapter.