Closing soon

New High School and Football Stadium for Clay-chalkville High School Package B: High School Building - 2100 18th Street South Birmingham, Al 35209

Description: Select demolition of existing buildings and site utilities, installation of new site utility and road infrastructure, and the construction of a new +/-350,000 gsf multi-story replacement high school for the county board of education. The building construction consists of poured-in-place concrete retaining walls, load bearing cmu with brick and eifs veneer, prefabricated concrete plank and composite steel floor framing, asphalt shingle roofing on light gauge metal trusses, tpo membrane low-slope roofing on metal deck and steel joists, and full MEP building system infrastructure.

Released
May 28, 2026
Closes
Aug 20, 2026(12 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts