CountyMS
Posted
Sep 17, 2026
Oct 15, 2026
Reunion Parkway Ditch Improvement Project RFP
Work inlcudes 86 LF removal of fence, all types; 30 LF removal of pipe, 8" and above; 52 EA removal of trees greater than 10"; 8,800 CY channel excavation, fme, ah; 24,700 SY topsoil for slope treatment, from right-of-way; 24,700 SY standard ground preparation; 5 ACR grassing; 11 TN agricultural limestone; 6 TN mulch, vegetative mulch; 14,360 SY erosion control blanket, type i; 5,500 LF temporary silt fence; 170 LF wattles, 20". See attached file.
