CityIA
Posted
Sep 17, 2026
Oct 22, 2026
Woodside Dr Repair 2027 Project
Work includes approx. 26 CY excavation, class 10; 127 SY 8" full depth patched pcc; 19 LF of 12" PVC storm sewer, trenched. This project generally includes removal and replacement of PCC pavement, PCC sidewalk, and a sanitary sewer manhole, as well as the installation of a storm sewer manhole, intake, and associated piping.
