CountyMT
Posted
-
Dec 4, 2026
Ravalli County - Lost Horse Ditch Project RFP
Sealed bids for harvesting approximately 5,000 tons of mixed-conifer sawlogs for the Lost Horse Ditch Project.
Description: Work inlcudes 86 LF removal of fence, all types; 30 LF removal of pipe, 8" and above; 52 EA removal of trees greater than 10"; 8,800 CY channel excavation, fme, ah; 24,700 SY topsoil for slope treatment, from right-of-way; 24,700 SY standard ground preparation; 5 ACR grassing; 11 TN agricultural limestone; 6 TN mulch, vegetative mulch; 14,360 SY erosion control blanket, type i; 5,500 LF temporary silt fence; 170 LF wattles, 20". See attached file.
County · MS, US
Decision makers connected to this RFP from Madison County.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CountyMT
Posted
-
Dec 4, 2026
Sealed bids for harvesting approximately 5,000 tons of mixed-conifer sawlogs for the Lost Horse Ditch Project.
CountyCO
Posted
Nov 10, 2026
Dec 8, 2026
El Paso County and the Pikes Peak Rural Transportation Authority (PPRTA) are seeking qualified contractors to provide labor, materials, and equipment for phases of the Mesa Ridge Parkway Improvement Project. The solicitation states that the work is funded by PPRTA and El Paso County. Bids are submitted through BidNet Direct, and questions are due November 20, 2026.
CityCA
Posted
Nov 12, 2026
Dec 17, 2026
The Work comprises, but is not limited to: mobilization; traffic control; 1.5-inch and 2-inch full-width grind and overlay; selective 8-inch grind AC patch; slurry seal Type II, ramp improvements, adjustment of utility manhole covers and water valve can covers as necessary; restoration of striping, protect and/or restore survey monuments and traffic signal detection loops, video detection systems, pavement markings/ markers, and legends/signs/poles, and installation of an advanced pedestrian system along Chino Hills Parkway. Work shall be completed in compliance with approved Project Design Plans and Specifications, on file with the City Clerk. Directions to Chino Hills City Hall. Wage Information: California Department of Industrial Relations.
CityCA
Posted
Oct 30, 2026
Dec 11, 2026
The City seeks a qualified consultant to evaluate alternatives for the Fair Oaks Avenue/Arroyo Parkway (SR-110) interchange and address existing operational and traffic challenges. The consultant will review prior information and compare the Hook-Ramp and Loop-Ramp alternatives, including technical feasibility, community impacts, costs, and implementation risks. The work will culminate in a memorandum documenting findings, recommendations, and next steps.