Open RFP

Marina D-Dock Replacement (Request for Proposal)

Description: Demolish and dispose of existing timber floating dock assembly at d-dock. The concrete mooring piles shall remain. 2. Install new approx. 8 FT Wide by 253 FT Long timber floating dock as shown in attachment a. 3. Minimum specifications for the proposed floating dock system can be found in attachment b. Ipe decking and 316l stainless steel connection hardware are required throughout. 4. Installation of new power pedestals equipped with water and electricity. 5. The contractor must be licensed in marine construction.

Buyer
City of Beaufort

City · SC, US

Released
Nov 17, 2026
Closes
Dec 15, 2026(23 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts