CitySC
Posted
Nov 19, 2026
Dec 11, 2026
Ehrhardt \& Doughty Street Drainage Connection Project RFP
The City of Charleston is procuring construction services to add a drainage connection from surface collection within the Ehrhardt Street right-of-way to the Ehrhardt Street deep tunnel drop shaft to improve drainage in the Johnathan Lucas/Medical District Basin. The work scope includes demolition, excavation, relocation of water and sanitary utilities by a CWS pre-qualified contractor as required, installation of approximately 277 feet of concrete pipe, paving and curb/sidewalk repairs, erosion control, turf reinstatement, traffic control, and delivery of certified as-built construction drawings. The solicitation also requires coordination with MUSC and other utilities, includes a bid alternate for additional similar work, and may require utility conflict relocations as shown in the contract drawings.