CityMO
Posted
Sep 29, 2026
Oct 20, 2026
Replacement of Bridge 9 on MKT Trail
The City of Columbia is seeking bids to replace the existing Bridge 9 on the MKT Trail, including the labor, materials, and equipment specified for the work. Preliminary plans describe a 105-foot, single-span prefabricated bridge designed to accommodate heavier maintenance and emergency vehicles. Construction was expected to begin in late November 2026 and finish near the end of March 2027, weather permitting.
