Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a water producing well capable of providing 100 GPM of water flow. The contractor is to provide the construction of the well hole to a depth suitable for the desired water supply, install the casing, submersible pump, power connection, controls, pressure tank, piping and connecting valves. Miscellaneous restoration and site work is also included. .
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Posted Date
Dec 1, 2025
Due Date
Jan 26, 2026
Release: Dec 1, 2025
Close: Jan 26, 2026
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS furnish and install storm water pollution prevention plan; 1 LS furnish and implement trench safety system; 1 LS construction of new booster pump station building; 1 LS furnish and install new booster pumps and all related appurtenances; 1 LS furnish and install all site piping, valves, fittings, bedding, and related work to connect the existing welded steel tank to the existing potable water system; 1 LS furnish and install all site electrical for pump station and miscellaneous items. See attached file.
Posted Date
-
Due Date
Feb 2, 2026
Close: Feb 2, 2026
Work includes 1 LS furnish and install storm water pollution prevention plan; 1 LS furnish and implement trench safety system; 1 LS construction of new booster pump station building; 1 LS furnish and install new booster pumps and all related appurtenances; 1 LS furnish and install all site piping, valves, fittings, bedding, and related work to connect the existing welded steel tank to the existing potable water system; 1 LS furnish and install all site electrical for pump station and miscellaneous items. See attached file.
AvailableWork includes approx 1,526 LF 6" force main via horizontal directional bore from the existing sanitary pumping station. The existing force main will be abandoned in place. The sanitary pumping station modifications consist of new floor hatch doors, valves and piping. Operations will require phasing to keep the sanitary pumping station operational during the work. See outside link.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Work includes approx 1,526 LF 6" force main via horizontal directional bore from the existing sanitary pumping station. The existing force main will be abandoned in place. The sanitary pumping station modifications consist of new floor hatch doors, valves and piping. Operations will require phasing to keep the sanitary pumping station operational during the work. See outside link.
AvailableThe Project consists of the construction of a new finished water pumping station at the Rolling Mill Water Treatment Plant in the Town of North East and the decommissioning and demolition of the existing finished water pumping station. Work includes excavation, demolition, masonry building construction, watermain replacement, instrumentation, electrical work, control system integration, HVAC work, and site restoration. Decommissioning of the existing finished water pumping station shall include replacement of electrical raceways, furnishing and installing replacement submersible wastewater pumps and pump control panel, and capping water supply piping.
Posted Date
Dec 5, 2025
Due Date
Jan 29, 2026
Release: Dec 5, 2025
Close: Jan 29, 2026
The Project consists of the construction of a new finished water pumping station at the Rolling Mill Water Treatment Plant in the Town of North East and the decommissioning and demolition of the existing finished water pumping station. Work includes excavation, demolition, masonry building construction, watermain replacement, instrumentation, electrical work, control system integration, HVAC work, and site restoration. Decommissioning of the existing finished water pumping station shall include replacement of electrical raceways, furnishing and installing replacement submersible wastewater pumps and pump control panel, and capping water supply piping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →