Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project consists of the construction of a new finished water pumping station at the Rolling Mill Water Treatment Plant in the Town of North East and the decommissioning and demolition of the existing finished water pumping station. Work includes excavation, demolition, masonry building construction, watermain replacement, instrumentation, electrical work, control system integration, HVAC work, and site restoration. Decommissioning of the existing finished water pumping station shall include replacement of electrical raceways, furnishing and installing replacement submersible wastewater pumps and pump control panel, and capping water supply piping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This Request for Qualifications is for consulting services to manage the surface preparation and repainting of the Water Pumping Station #4 Reservoir.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
This Request for Qualifications is for consulting services to manage the surface preparation and repainting of the Water Pumping Station #4 Reservoir.
AvailableCounty intends to procure the services of a construction firm to furnish all materials and the construction, complete in place, of architectural and structural improvements; mechanical equipment and piping replacement; valves; HVAC equipment replacement; electrical equipment, conduit and wiring replacements; controls/SCADA equipment, conduit and wiring replacement; bypass vault, piping and valves; and temporary bypass pumping services and miscellaneous appurtenances and incidental items of work.
Posted Date
Dec 3, 2025
Due Date
Jan 28, 2026
Release: Dec 3, 2025
Close: Jan 28, 2026
County intends to procure the services of a construction firm to furnish all materials and the construction, complete in place, of architectural and structural improvements; mechanical equipment and piping replacement; valves; HVAC equipment replacement; electrical equipment, conduit and wiring replacements; controls/SCADA equipment, conduit and wiring replacement; bypass vault, piping and valves; and temporary bypass pumping services and miscellaneous appurtenances and incidental items of work.
Provide construction services for the installation of three new controls modifications to the town's waste water pumping stations.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Provide construction services for the installation of three new controls modifications to the town's waste water pumping stations.
AvailableWork includes approx 1,526 LF 6" force main via horizontal directional bore from the existing sanitary pumping station. The existing force main will be abandoned in place. The sanitary pumping station modifications consist of new floor hatch doors, valves and piping. Operations will require phasing to keep the sanitary pumping station operational during the work. See outside link.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Work includes approx 1,526 LF 6" force main via horizontal directional bore from the existing sanitary pumping station. The existing force main will be abandoned in place. The sanitary pumping station modifications consist of new floor hatch doors, valves and piping. Operations will require phasing to keep the sanitary pumping station operational during the work. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis