Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 1,526 LF 6" force main via horizontal directional bore from the existing sanitary pumping station. The existing force main will be abandoned in place. The sanitary pumping station modifications consist of new floor hatch doors, valves and piping. Operations will require phasing to keep the sanitary pumping station operational during the work. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide engineering services for sanitary pumping station and force main rehabilitation project.
Posted Date
Dec 29, 2025
Due Date
Jan 20, 2026
Release: Dec 29, 2025
Close: Jan 20, 2026
Provide engineering services for sanitary pumping station and force main rehabilitation project.
AvailableLift station and force main construction work includes 1,698 LF 4" ASTM D2241 PVC pipe force main, non str backfill; 1,858 LF 4" ASTM D2241 PVC pipe force main, str backfill; 7 EA 4" MJ bend; 1 EA connec to existing manhole; 3,246 LF 2" PVC sch 40 water line; 1 EA water meter and RPZ; see outside link.
Posted Date
Dec 31, 2025
Due Date
Jan 21, 2026
Release: Dec 31, 2025
Close: Jan 21, 2026
Lift station and force main construction work includes 1,698 LF 4" ASTM D2241 PVC pipe force main, non str backfill; 1,858 LF 4" ASTM D2241 PVC pipe force main, str backfill; 7 EA 4" MJ bend; 1 EA connec to existing manhole; 3,246 LF 2" PVC sch 40 water line; 1 EA water meter and RPZ; see outside link.
AvailableProject consists of constructing a replacement gunning sanitary sewer pump station and appurtenances, 8" and 12" gravity sewer lines and appurtenances, 8-inch force main including horizontal directional drilling (hdd) crossing of beech fork, and 20" and 16" water main installation including hdd.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
Project consists of constructing a replacement gunning sanitary sewer pump station and appurtenances, 8" and 12" gravity sewer lines and appurtenances, 8-inch force main including horizontal directional drilling (hdd) crossing of beech fork, and 20" and 16" water main installation including hdd.
AvailableProcurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.
Posted Date
-
Due Date
Feb 6, 2026
Close: Feb 6, 2026
Procurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis