Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of Sewer and Drain Pump Station Wet Well Cleaning.
Posted Date
Jan 22, 2026
Due Date
Feb 5, 2026
Release: Jan 22, 2026
Close: Feb 5, 2026
Work consists of Sewer and Drain Pump Station Wet Well Cleaning.
AvailableWork includes 1 LS furnish and install storm water pollution prevention plan; 1 LS furnish and implement trench safety system; 1 LS construction of new booster pump station building; 1 LS furnish and install new booster pumps and all related appurtenances; 1 LS furnish and install all site piping, valves, fittings, bedding, and related work to connect the existing welded steel tank to the existing potable water system; 1 LS furnish and install all site electrical for pump station and miscellaneous items. See attached file.
Posted Date
-
Due Date
Feb 2, 2026
Close: Feb 2, 2026
Work includes 1 LS furnish and install storm water pollution prevention plan; 1 LS furnish and implement trench safety system; 1 LS construction of new booster pump station building; 1 LS furnish and install new booster pumps and all related appurtenances; 1 LS furnish and install all site piping, valves, fittings, bedding, and related work to connect the existing welded steel tank to the existing potable water system; 1 LS furnish and install all site electrical for pump station and miscellaneous items. See attached file.
The project as a whole includes improvements to the main pump station. Improvements include demolition of existing building, equipment, HVAC, electrical, controls, Scada equipment, lighting, plumbing, and concrete and replacement of electrical, controls, HVAC, Scada equipment, lighting, and plumbing. The project also includes installation of concrete, access hatches, and all related work. Owner will be performing tree removal and fence replacement during the construction.
Posted Date
Jan 9, 2026
Due Date
Feb 11, 2026
Release: Jan 9, 2026
Close: Feb 11, 2026
The project as a whole includes improvements to the main pump station. Improvements include demolition of existing building, equipment, HVAC, electrical, controls, Scada equipment, lighting, plumbing, and concrete and replacement of electrical, controls, HVAC, Scada equipment, lighting, and plumbing. The project also includes installation of concrete, access hatches, and all related work. Owner will be performing tree removal and fence replacement during the construction.
The City of Sycamore is soliciting bids for construction improvements at the Wastewater Treatment Plant’s Influent Pump Station. The work includes rehabilitation and replacement of mechanical screening and washer/compactor equipment, influent slide gates, potable/non-potable water system components, HVAC and lighting, door replacements, a new autosampler, interior painting, and an alternate to replace the 800 kW diesel generator. Bidding documents are available through BHFX Digital Imaging, and a mandatory pre‑bid conference will be held on February 3, 2026 at 10:00 AM.
Posted Date
Jan 20, 2026
Due Date
Feb 24, 2026
Release: Jan 20, 2026
Close: Feb 24, 2026
The City of Sycamore is soliciting bids for construction improvements at the Wastewater Treatment Plant’s Influent Pump Station. The work includes rehabilitation and replacement of mechanical screening and washer/compactor equipment, influent slide gates, potable/non-potable water system components, HVAC and lighting, door replacements, a new autosampler, interior painting, and an alternate to replace the 800 kW diesel generator. Bidding documents are available through BHFX Digital Imaging, and a mandatory pre‑bid conference will be held on February 3, 2026 at 10:00 AM.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis